Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Work Background
Tuteur académique
Centre National de Télé-Enseignement de MadagascarTuteur académique
Aug. 2022 - Nov. 2025Toamasina I, Atsinanana, Madagascar
ELECTRICAL TECHNICIAN
AmbatovyELECTRICAL TECHNICIAN
May. 2011Toamasina AMBATOVY Nickel-Cobalt PlantBeing Low Voltage Electrical technician according to NF C 18 510 accreditation
ELECTRICAL TECHNICIAN
ST ELECELECTRICAL TECHNICIAN
Dec. 2010 - Feb. 2011Ambatovy Mine Site MoramangaBy being subcontractor(Services,Technologies and Electricity ST ELEC): Perform POVT(Pre-Operational Verification Test) and Precommissioning of all Schneider Electric 690V- Okken MCC with Tesys-T relays controllers and ATV71 Altivar/ 6.6kV- Motor pact and switchgear with 6.6kV Allen Bradley VFD PowerFlex 7000 of ROCKWELL/ 11kV-Vaccuum MC set switchgear/ 690V-6.6kV Inductions motors in Ore-scrubber, north clarification, water pump and slurry pumps of Nickel-Cobalt Lateritic mining process, ramp up
ELECTRICAL TECHNICIAN
Schneider Electric Industrial ServicesELECTRICAL TECHNICIAN
Mar. 2010 - Nov. 2010Toamasina AMBATOVY Project Nickel-Cobalt PLANT SITEBy being subcontractor(SOMECA/HFF): 1- Install in 21 electrical substations: a) Schneider Electric Industrial equipment's such 220V/400V distribution panels for lightings and sockets/ 690V- Okken Switchboard & MCC(Motor Control Center) with Tesys-T intelligent relays controller for motor management, Altivar ATV71 and transformers/ 6.6kV-Switchgear, Motor pact with SEPAM and Allen Bradley Power flex 7000 VFD(Variable Frequency Drive) of ROCKWELL/ 11kV-MCset Vacuum switchgears linked with transformers by bus ducts b) i-Guard electrical industrial équipements such NER for impedant neutral resistance protection c) UPS(Uninterruptible Power Supply) EATON 9155 & 9355 2- Perform Insulation Resistance testing of all control and power cables, Induction motors/ Perform Micro-resistance contact in the ribs and linings between each 690V-MCC/ 6.6kV-Motor pact/11kV- MCset bus bars raiser(Merlin Gerin) with microhmmeter 3-Pre-commissioning, commissioning and ramp up
ELECTRICAL TECHNICIAN
STEF Studenten AdviserenELECTRICAL TECHNICIAN
Jul. 2009 - Mar. 2010Antananarivo
TECHNICAL ASSISTANT
G4STECHNICAL ASSISTANT
Jan. 2007 - Dec. 2009AntananarivoBeing technical assistant, we are in charge to install and implement a surveillance system with exchange of electronic alarm with motion detectors and surveillance cameras
ELECTRICAL TECHNICIAN
BPELECTRICAL TECHNICIAN
Jun. 2004 - Aug. 2004ToliaraBy being subcontractor(SOMECA/HFF&Cie): Install solar panels power system in the basic health center(CSB2) and college of general teaching(CEG)
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Alain Tolojanahary on Intch
Education
1107009 people
15
Consultant en Ingénierie sociale
17
Consultant Associé @ KIOKA CONSEIL
25
Managing Director @ Airtel Mobile Commerce Madagascar
EducationScientist
72602 people
15
Lighting and Illumination Analyst
15
Dentist @ ASSMB
15
bioquimico