Honeywell Process SolutionsOTS Application Engineer
Aug. 2007 - Nov. 2008London (CAN) for the LNG Model Upgrading for RASGAS, 7 months for a temporary assignment. Modeling of new facilities with Shadow Plant.
Upgrading, configuration, reconstruction and Start-up and Shut-down tests of the models for the following units: Inlets, Acid Gas Recovery, Dehydration Section, Propane Refrigeration and Recycle Loop, Sulphur Recovery Unit, NGL Recovery, Selexol Absorption, Deethanizer, Depropanizer, Debutanizer, Deisopentanizer, C2/C3/C4 Treaters. Heat Transfer Film Coefficients estimation, through correlations and use of simulations Tools. STE / HTRI / Unisim Design. Whole dynamic modeling for a Slug Catcher Fingertip and control scheme for the reception of offshore gas. DCS and Triconex emulation and integration with the Inlets Model.
Participation in FAT with RASGAS personnel.