PT Adhi Karya (Persero) Tbk.Team Leader Process at PLTU Lampung 2 x 100 MW, Project Process Representative in Xian
Jan. 2010 - Dec. 2011Activities performed Approve and review all basic design deliverables such as process model, process datasheet, equipment data sheet, hydraulic analysis, instrument datasheet, steam and utility balances, PFD and P&ID, HAZOP, process description, make engineering judgment to any of outstanding technical issues, conduct value engineering workshop, constructability program, and coordination and interfacing the works Name of assignment or project : Proposal • EPCI KG Gas Development Project Star Energy, Ltd • TARAHAN COAL FIRE STEAM POWER PLANT 1 & 2 ( 2 x 100 MW) • KALIMANTAN TIMUR COAL FIRE STEAM POWER PLANT 9 2 x 100 MW • KRAKATAU DAYA LISTRIK COAL FIRE STEAM POWER PLANT 2 x 150 MW • RIAU COAL FIRE STEAM POWER PLANT ( 2 x 100 MW) • PLTG WAIJO • EDK CILEGON LNG RECEIVING TERMINAL • Water Treatment Plant RAYON UTAMA MAKMUR • TEMBILAHAN COAL FIRE STEAM POWER PLANT ( 2 x 7 MW) Location : Indonesia Main Project Scope of work EPCC Position Held : Team leader Activities Performed : Working with the assigned multi dicipline engineers to define scope, design and technical documentation as required for the proposal deliverebles such as BED, specification, datasheets, drawings, calculations, descriptions, requisitions, TBE, BOQ must be clearly defined, confirming thet required exception, deviations, and risks managements are incoperated into the proposal, preparing project engineering plan and strategy, organisation charts, workhour estimation, schedule and others documentation required for the proposal