Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Work Background
Project Management Director
ŞA-RA Şirketler GrubuProject Management Director
Jan. 2026Ankara, Türkiye
Project Director
Milvus RoboticsProject Director
Jul. 2025 - Jan. 2026Ankara, TurchiaManaged the active execution and site integration phases of Autonomous Mobile Robot (AMR) systems. Initiated foundational structures for a Project Management Office to standardize workflows across engineering, manufacturing, and field services. Focused on bridging pre-sales technical feasibility with project delivery, ensuring tight control over scope, timelines, and proactive risk mitigation.
Project Group Manager
Bozankaya A.Ş.Project Group Manager
Oct. 2019 - Nov. 2024Ankara, TürkiyeLed the strategic execution of €100+ million rolling stock manufacturing projects for multinational manufacturers located in Spain, France, Austria and the US. Managed all aspects of bidding, contracts, and project delivery, leading a cross-functional team of over 120 personnel within a strong-matrix organization.
Rolling Stock Supply Chain Group Manager
Bozankaya A.Ş.Rolling Stock Supply Chain Group Manager
Nov. 2018 - Oct. 2019Ankara, TurkeyManaged a €45 million annual purchasing budget, ensuring cost-effectiveness and timely material procurement for production. Established a dedicated production planning department and implemented a comprehensive planning system. This system encompassed all levels of planning activities, from rough-cut capacity planning to work order level, ensuring efficient production flow and on-time delivery. Reduced downtime by 90% on production lines through Kanban system implementation. Delivered the Bangkok Greenline metro project on time with a record-low 0.1% material shortage rate, surpassing global benchmarks for Siemens Mobility projects. Prepared and secured investment approval for the construction of a tram manufacturing plant.
Internal Logistics and Warehouse Manager
Bozankaya A.Ş.Internal Logistics and Warehouse Manager
Jul. 2015 - Nov. 2018Ankara, TurkeySpearheaded the design, planning, and implementation of a comprehensive warehouse and internal logistics system for Bozankaya's new rail system vehicle and electric bus production plant. Established and led a high-performing warehouse and logistics organization, ensuring smooth operations. Successfully integrated SAP logistics modules and coordinated the ERP integration of supply chain processes between Bozankaya and a leading bus manufacturer for the joint electric bus project.
Production Planning Manager
MikroporProduction Planning Manager
Mar. 2015 - Jul. 2015Ankara, Turkey
SAP MM Functional Lead&Process Owner
Bozankaya A.Ş.SAP MM Functional Lead&Process Owner
Apr. 2008 - Sep. 2019Ankara, TürkiyeProven track record in full-cycle SAP MM implementation, rollout, and enhancement projects across group companies. Played hybrid roles as internal SAP consultant, functional lead, and process owner, collaborating with external consultants and also independently driving configuration and process design. Skilled in business process mapping, system customizing, end-user support, and cross-functional integration with PP, SD,CO and FI modules. Known for combining hands-on SAP expertise with strategic project management capabilities in complex manufacturing settings. Key projects: +2009 – SAP MM Implementation Project - Bozankaya A.Ş.: Successfully supported end-to-end activities of SAP MM module including process design, master data preparation, and post-implementation support in key-user role +2010 – VDA4905 EDI Integration Project - Bozankaya A.Ş. – MAN Türkiye: Led SD-side process integration with MAN Türkiye’s EDI-based order system in compliance with VDA4905 automotive standards. +2011 – Conceptual Design for SAP MM Implementation - Bozankaya GmbH: Delivered conceptual design, tailoring SAP MM processes to the company operations +2012 – SAP MM Rollout - TCV Ltd. Şti.: Managed the rollout of SAP MM module, adapting core procurement and inventory management processes to local business structure and user requirements in integration with MAN Türkiye and Bozankaya A.Ş. covering cross-company stock transfer operations and tailored warehouse management system +2015 – SAP MM Rollout - Bozankaya A.Ş. Commercial Vehicles Production Plant: Directed MM module rollout at newly established vehicle production plant, covering intracompany stock transfer operations with the older plant +2016 – Subcontracting Integration Project - Bozankaya A.Ş. – Karsan A.Ş.: Implemented tailored SAP MM solution for subcontracting flow between Bozankaya and Karsan
Production Planning and Order Management Specialist
Bozankaya A.Ş.Production Planning and Order Management Specialist
May. 2006 - Mar. 2015Ankara, Turkey
Harness Production Leader
DelphiHarness Production Leader
Sep. 2005 - Mar. 2006Izmir, Turkey
Production Planning Engineer
SÖKTAŞ TEKSTİLProduction Planning Engineer
Aug. 2004 - Sep. 2005Aydin, Turkey
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Alperen on Intch
IT
1026939 people
42
Company Owner @Legal Technology, PMP® @ Legal Teknoloji
17
COO @ Renga
18
Sales Specialist @ ADA NOKTA METAL
ITSolution Integrator
84512 people
17
COO @ Renga
15
CTO, Platform Developer, Senior Full-stack Developer
19
Sr. Fullstack Dotnet Developer