HARMAN InternationalSenior Test Engineer
May. 2015 - Jun. 2016Farmington Hills, MiFiat MY15+ Project and CMC MY14 MY15 Post Launch Service Release •Integration Test Lead coordinating with India team to initiate and ensure Sanity, Smoke, Connectivity, and KPI tests are completed across Fiat 940/330, 520/334 NA, EU,ROW, and Turkey regions and, CMC MY14 and 15 service release builds; Remaining NA dependant test cases completed locally in vehicle/bench •Test and validate all Harman responsible domains (Nav, Tuner, Bluetooth, Apps, Connectivity, etc) via Adhoc testing in vehicle •Ensure post launch service release issues reported by customer are validated per request •Flash fleet vehicles and ensure all headunits and test set-ups are up to date •Configure proxies in headunit using Raft to communicate via CAN •Side load binaries onto system and verify fix before full integration build •Lead FIAT exploratory internal test drives around Greater Detroit Area •Manage fleet amongst test team, and systems team •Assign tasks to interns and test engineers •Attend customer Ride and Drive trips locally and long distance •Attend meetings with CPM, systems, and management to discuss project status and upcoming requests •Compile fleet information such as mileage, issues documented, fixes verified/reproduced •Capture GN Logs and Can Logs using bluepirat, raft, and TraceClient Chrysler CMC MY16, MY16.5, and MY17 Projects (May 2015-February 2016) •Overall system test on all Harman responsible domains including Navigation, Tuner, Apps, Connectivity and Bluetooth •Adhoc testing in vehicle, accruing atleast 1000 miles per week across different software lines as required by program, ensuring system stability in vehicles •Assist in Integration Activities (Smoke, Sanity, KPI tests) •Support Automation of Integration activities •Verify and reproduce known defects in systems, and provide appropriate logs as requested by developers •Attend Chrysler Ride and Drive events •Generate vehicle reports for management, and attend weekly meetings to discuss current project status