Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Work Background
Project Engineer level-2
Vector Corrosion TechnologiesProject Engineer level-2
Jul. 2023Dubai, United Arab EmiratesSpecialized Contracting, Corrosion Mitigation, Cathodic Protection, Condition Assessment
Project Manager
KABBANI CONSTRUCTION GROUP- KCGProject Manager
Nov. 2016 - Sep. 2024Saudi Arabia- Monitoring the work being performed to completion (cost and time) and be accountable for reporting on status to Management at all times. - Ensuring that client sustainability goals and objectives are set properly and identify root causes of environmental problems recoded by clients and assess potential environmental risks in the project and Conduct required observations, tests and analysis in order to reach conclusions. - Propose appropriate action plans and protocols. Design innovative ideas and solutions that are feasible in the given context to improve the environmental practices in the projects. - Work closely with all cross-functional team members, partners, counterparts and stakeholders in ensuring project outputs are of the highest quality and that expected results are achieved in a timely and efficient manner and maintaining the companyโ€™s environmental files and programs. - Coordinate efforts with Teams to set goals and adopt new programs, track the impacts of changes in operations, lead internal audits for sub-contractors (waste and recycling separation and energy use etc.) for sub-contractors and insure all equipment, tools certified and up to standards. - Files and obtains permits associated with wetlands, coastal management areas and other associated projects such as drilling structures permits required by clients (Royal Commission โ€“yanbu) - Coordinate with sub-contractor and prepare specifications and standard as per scope of works.
Civil Engineer
Global Construction Company (GCC)Civil Engineer
Mar. 2016 - Nov. 2016SAUDI ARABIA- Organize project priority, Define activities as well as estimating activity cost, duration and resources - Developed construction cost estimates and conducted construction inspections - Developed initial construction plans and specifications as per project requirements - Performed design modifications and solved complex issues by coordinating with senior design engineering staff - Recommended best solutions for site problems, risks and safety on site, construction techniques and work methodology by carrying out cause and effect analysis to develop solutions that saves up to 110K $.
Resident Civil Engineer
ACE-Architects & Consulting EngineersResident Civil Engineer
Oct. 2013 - Mar. 2016Sudan- Determine project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements. - Providing technical support in the preparation of reports, cost estimates and contract documentation. - Coordination with Senior Managers, Sub-contractors and co-workers for the timely completion. Create catch-up program (by primavera-P6) that helped the project to handle on time.(as a planning engineer) - Quantity surveying of all site works for check and approval of contractor payments. - Discuss contractor work plan progress, delayed activities and their effect on the plan. - Preparation of material off take for structural & architectural works and coordination with various departments for smooth functioning of the project
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Hassan on Intch
Engineer
501717 people
16
Health, Safety & Environment - Digital @ Petrofac
41
AI Engineer / Data Scientist @ Midis Group
22
Safety specialist @ Non
EngineerCivil engineer
62603 people
0
CEO @ Aero Iron Construction and trading PLC
16
Civil Structural Consultant
48
NA @ NA