Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Work Background
EPC Site Manager
VoltaliaEPC Site Manager
Nov. 2024Dakar, Dakar Region, Senegal- Manage electrical, mechanical, civil works aspects of construction of a 60 MWc / 72 MWh Solar Plant, by developing project schedules, estimating budgets, procuring equipment and materials, and overseeing installation and testing processes. - Supervise and manage construction activities, including site preparation, material procurement, and equipment selection. - Coordinate with contractors, subcontractors, and construction teams to ensure smooth project execution. - Monitor construction progress, address any issues or conflicts, and make necessary adjustments to ensure quality and timely completion. - Ensure that all electrical, mechanical and civil systems and installations comply with respectively relevant electrical, mechanical, and civil codes, regulations, and safety standards. - Stay updated on local and national standards and make sure the designed systems adhere to them. - Work collaboratively with EPC team, contractors, and other professionals involved in the construction project.
Jr. Project Manager / Commissioning Engineer
Off-Grid EuropeJr. Project Manager / Commissioning Engineer
Nov. 2021 - Nov. 2024Dakar Region, Senegal- Planning and Organization of Project Activities - Data collection for the optimization of different processes - Commissioning and Performance Tests of Offgrid systems - Creation of commissioning schedules and procedures - Continuous Improvement - Identification, and rectification of reservations - Participating in Business Development, Project Development and Systems Improvement - Work with clients to identify and implement projects designed to meet specific client needs - Evaluation of the installations of establishments of all kinds to identify opportunities to optimize electricity consumption - Training employees and clients - On-site and remote troubleshooting
Industrial and Systems Engineer
Rochester Institute of TechnologyIndustrial and Systems Engineer
Aug. 2019 - Aug. 2021Rochester, New York, United States• Jan 2020 – Apr 2020: Project Management/ Lean Six Sigma: Project Cookies For College - Application of the DMAIC method to improve the production, packaging, and distribution processes to deliver different kinds of cookies to 5 different colleges. - Application of tools and fundamental techniques of Lean Six-Sigma such as standard operating procedure, the 5S, a control plan, and RACI chart. • Aug 2020 -Dec 2020: Linear Regression: Analysis of mean household income - Collection of Data and establishment of the relationship between mean household income, education score, political leanings, and the number of businesses in each state of the US. - Fitting a regression model • Aug 2019 – Dec 2019: Systems Engineering: Reverse Engineering of a Kwikset Smartcode 909 - Teardown of the Kwikset - Functional Analysis, Cost worth Analysis - Identification of different stakeholders - Assessment and anticipation of stakeholders needs - QFD Matrix - Designed and modeled a 3D improved version of the Kwikset SmartCode considering previous analyses - A3 presentation • Aug 2019 – Dec 2019: Systems Simulation : Simio Regional Airport - Developped a virtual model of the airport - Analysis of passengers traffic data on Excel and Access - Simulation of passengers traffic within the airpport, and experimentation of different scenarios and configurations of the airport - Increasing of passenger throughput by 256% and reduction of waiting time by 7 minutes
Science Teacher
Groupe Scolaire Evangélique de MakélékéléScience Teacher
Oct. 2017 - Mar. 2019BrazzavilleMAIN RESPONSIBILITIES: - Conducted classroom activities with a group of 28 students between 15-18 of age * Created and delivered consistent and interactive courses * Implemented multiple experimental activities to increase student’s learning motivation * Communicated with both school administration and students’ parents to report on student behavior, development, and social progress. * Participated in ongoing staff training sessions MAIN ACHIEVEMENTS * Increased average mean of students’ grade by 31.25% * Realized a 96 % success rate
Science Teacher
Complexe Scolaire Anne-BenoiteScience Teacher
Oct. 2016 - Mar. 2019Brazzaville, Republic of the CongoMAIN RESPONSIBILITIES: * Conducted classrooms activities with two classes of 22, and 31 students respectively. * Employed assessment tools and proactive strategies to improve lessons delivery. * Assigned and graded homework. * Encouraged students to value both individual work and teamwork * Communicated with both school administration and students’ parents to report on student behavior, development, and social progress. * Participated in ongoing staff training sessions MAIN ACHIEVEMENTS: * Increased average mean of students’ grade by 25 % * Realized a 100 % success rate
Electromechanical Engineer
National Polytechnic School LabsElectromechanical Engineer
Sep. 2015 - Dec. 2016Brazzaville, Republic of the CongoMAIN RESPONSIBILITIES: - Repaired semi-modern tubular furnaces * Reverse-engineered the tubular furnaces * Performed a root cause analysis, and a cost worth analysis * Performed a Needs assessment * Changed the electric resistance of the furnace - Designed and built a temperature control device for the furnaces * Programmed a microcontroller to control the temperature within the furnace * Identified the type of thermocouple for temperature measurement * Incorporated a Keypad for desired temperature input, and an LCD screen for temperature and notification display - Design and built a stand to support the furnace and contain the temperature controller circuit * Made a 3D model of the stand using a CAD software * Chose the appropriate material * Cut the material to make the different pieces of the stand * Assembled and welded the different parts. MAIN ACHIEVEMENTS: - Repaired 2/3 of the furnaces - Achieved a 95 % accuracy with the microcontroller output - Helped the client minimizing their expenses by avoiding buying new tubular furnaces or paying for expert services. The approximate amount saved by client was about $30,000.
Research Assistant
Grande Ecole for Teachers’ TrainingResearch Assistant
May. 2013 - Sep. 2014Brazzaville, Republic of the CongoMAIN RESPONSIBILITIES: - Study of the formaldehyde radical (H2CO) Adsorption on a four-layer gold (001) Surface. * Performed calculations using a total energy program based on density functional theory * Interpreted the results * Compared the results with other research on the field MAIN ACHIEVEMENTS: - Identified the best binding site of the formaldehyde radical on gold (001) surface - Determined the adsorption energy of the formaldehyde radical on gold (001) surface - Contributed to further a Ph.D. research on the adsorption of Methyl (CH3) on the gold (001) surface by G. B. Bouka-Pivoteau (https://www.worldscientific.com/doi/abs/10.1142/S0218625X18501986)

Requests

Touchpoint image
2
Looking for a Job
Project Manager Consultant in Energy & Tech
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Destin Kellian on Intch
Design
1084859 people
16
Motion Designer 3D/2D - Video Editor @ Linelight Studio
16
Consultant @ GET ON AFRICA
16
PRATICIENNE BIEN ETRE
Design3D Designer
82189 people
16
Motion Designer 3D/2D - Video Editor @ Linelight Studio
15
CAD Designer Drafter
15
Senior Executive Assistant