Steeltown Film Academy Teen Film Crew
Oct. 2018 - Jun. 2019Pittsburgh, Pennsylvania, United StatesProject Manager
Maintain a record of project ideas
Ensure all proper equipment is appropriated and available at the filming site
Arrange meetings with client to present ideas, clarify specifications, and update on current progress of the project
Create correspondence explaining policies and procedures that limit client desires
Examine contract for ensuring completeness and acceptability of final project
Track progress of project to ensure it is meeting all guidelines of the contract
Organizing personnel so that the proper employees are available when required
Manage a group of 10 people Director
Prepare the set for position, location, and ranged of all cameras, lighting, and sound equipment
Manage each scene of filming to ensure video would play out per requirements of contract
Apply technical knowledge of lighting and sound effects to achieve desired result
Determine the filming times Producer
Ensure a smooth running filming environment
Conduct errands to ensure all props and filming supplies are available at the proper time
Contact other members of the team to ensure all necessary equipment and personnel are available at proper times Record the number of times each scene is filmed, notating the Director’s most preferred takes Editor
Splice together different scenes watching for discrepancies that distract from the flow of the film
Add in special effects, audio, and/or music Make sure that audio is properly synced to the appropriate location in the film
Clean up any unacceptable audio and correcting off-color scenes