logo
Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Work Background
Project Manager-Complex projects
DrM, Dr. Mueller AGProject Manager-Complex projects
Mar. 2024Elveția
Senior Plant Engineer
ClimeworksSenior Plant Engineer
Mar. 2022 - Feb. 2024Zürich, Cantonul Zürich, Elveția
System Arrangement Planner
Hitachi Zosen InovaSystem Arrangement Planner
May. 2016 - Feb. 2022Zürich Area, Switzerland- Flexibility verification for critical steam piping systems using Rohr2; - Provide supports for non critical piping system; - Verification of loads on nozzles of HRSG and Steam Turbine equipments; - Design and drafting special supports-for critical piping systems; - Selection of spring supports for critical piping systems; - Provide loads on civil structures according to calculation output; - Review of main critical system (HP, LP and ByPass valves steam systems); - Routing definition for the Boiler and Steam turbine HP, LP lines; - PDMS design of civil structures and interaction with Civil department regarding loads on structures and foundations; - Design of compact Modules for the main pipe rack and WSC systems, -Coordination and support for the detail engineering suppliers, -Reviewer of main technical decisions/ direction of EPC projects; -Creation of internal specifications;
Piping Design Engineer/ Project engineer
Endress+Hauser GroupPiping Design Engineer/ Project engineer
Nov. 2015 - May. 2016Basel Area, Switzerland-Basic design of Flow Metering Skids -Autocad 3D Plant piping, equipment, steel design, -Support prefabrication and interaction with suppliers, -Create and/or verify detail engineering drawings (general arrangements, equipments drawings,piping and instrumentation diagrams, etc.) -Verification piping stress calculation,
Arrangement and piping engineer
Alstom PowerArrangement and piping engineer
Jul. 2013 - Nov. 2015BadenTzafit Project- Steam Injection-Gas Turbine Birr4 Project 9E Project- R&D -most compact Power Plant 2 on 1 arrangement Assignments: - Flexibility verification for critical steam piping systems using Rohr2; - Provide supports for non critical piping system; - Verification of loads on nozzles of HRSG and Steam Turbine equipments; - Design and drafting special supports-for critical piping systems; - Selection of spring supports for critical piping systems; - Provide loads on civil structures according to calculation output; - PDMS design of piping HP, LP and ByPass valves steam systems ; - Routing definition for the Boiler and Steam turbine HP, LP lines; - PDMS design of civil structures and interaction with Civil department regarding loads on structures and foundations; - Design of compact Modules for the main pipe rack ; PHES Project -R&D -Electricity Storage Pumps-Heating high pressure propane Assignments: - Flexibility verification for critical piping systems using Rohr2; - Provide supports for non critical piping system; - Verification of loads on nozzles of different equipments; - Design and drafting special supports-for critical piping systems; - Selection of spring supports for critical piping systems; - Provide loads on civil structures according to calculation output; - PDMS design of piping for the entire installation ; - Design the skid complete installation;
Piping stress and supports engineer
SnamprogettiPiping stress and supports engineer
Sep. 2011 - Dec. 2012Zona metropolitană Mexico City- Flexibility verification for critical piping systems using Caesar2; - Provide supports for non critical piping system; - Verification of loads on nozzels of different equipments (pumps, heat exchangers, horizontal vessels); - Flange verification for critical piping systems; - Design and drafting special supports-for critical piping systems; - Provide loads on civil structures according to calculation output
FIELD Piping Stress and Supports Engineer QAFCO5  Project
SnamprogettiFIELD Piping Stress and Supports Engineer QAFCO5 Project
Sep. 2010 - Aug. 2011- Assist the construction company in all problems regarding piping and piping supports; - Modification of standard and special supports according with site conditions; - Resolve punch items indicated by client inspectors; - Attendance in official meetings between engineering company and construction company;
Piping Stress and Supports Engineer (QAFCO5 and QAFCO6 Projects)
SnamprogettiPiping Stress and Supports Engineer (QAFCO5 and QAFCO6 Projects)
May. 2009 - Sep. 2010- Establish axial stop diagrams for critical pipe lines; - Flexibility verification for critical pipe lines routings using Caesar2; - Provide supports for non critical piping system; - Verification of loads on nozzels of different equipments (pumps, heat exchangers, horizontal vessels); - Flange verification for critical piping systems; - Design and drafting special supports; - Provide loads on civil structures according to calculation output.
Piping Engineer
SnamprogettiPiping Engineer
Nov. 2008 - Jun. 2009Bucharest, RomaniaPosition: Piping Engineer (Engro Pakistan Project) Assignments: - 3D modelling for different piping systems; - General arrangement extraction and correction; - Implementing logical supports from stress and support department to PDS; application as „detail for field”; - Nozzel orientation for different equipment; - P&ID’s mark-up and updating.
Project Engineer
Atlantis Deepwater Technology NorwayProject Engineer
Mar. 2008 - Jul. 2008Grimstad1) Hydraulic calculation: flow of air through 500 meters long Umbilical System connected to an Air compressor from an Oil Platform; Here I had to determine the losses of pressure, to dimension and optimize the diameter of the umbilical. 2) Calculation (simulation) of sea winds forces on the drilling casings. 3) Develop a Purchase Requisition for a Compressor and in the same time create a date base of possible Compressor Suppliers (I have contacted different Compressor Suppliers and I have received different offers regarding price, size, time of delivering + different technical solutions.
Mechanical Engineer
The Badger Company RomaniaMechanical Engineer
Aug. 2007 - Mar. 2008PloiestiIn this company I have done research in order to write my license diploma project entitled: The Design of a Piping System from a Chemical or Petrochemical Plant with Special Analyze of Static and Dynamic Tension State 1) Danielli Corus Project: In this project I have made change of the routing of an existing manifold (industrial gas). As well I was responsible for the hanging (support type) for the manifold. 2) OMV Petrom As Built Project. In this project I performed in the same time field activities (inspection of the installations) and indoor activities (updating the existing P&IDs, Data sheets of the main equipment, equipment list, Plot Plans). 3) Desmet Project: This project consisted in the design of all piping system for the Desmet Biodiesel Plant. I have performed 3D modelling activities using Cadworx application, produce Isometrics, checking of the Isometrics (handling line numbering and to set up piping line schedules, MTO).
P&ID Consultant
Halcrow RomaniaP&ID Consultant
Apr. 2007 - Jul. 2007PloiestiI was part of a large Project consisting in Updating of 1000 P&ID's for OMV Petrom Romania (the largest Oil Company in Romania). Here I have performed AutoCAD activities and I had to coordinate P&ID’s activities for different offshore area. I carried out my activities in the following: - The transpose of Piping and Instrumentation Diagrams (PID) and Utility Flow Diagrams (UFD) – AutoCAD format - Realize the equipment list afferent to PID’s and UFD’s - Realize the query list
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Nicolae Alin on Intch
Consulting
177514 people
32
Freelance data analyst @ myndworkz ltd
23
Marketing coordinator
15
Senior IT Project Manager @ UBS AG
ConsultingAdvisor
45902 people
16
Head of technical Service, Customer Projects and IMD @ Juice Technology AG
23
Material & Recipe Manager @ RD Nestle
22
Co-Founder @ MetaQuants