Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Work Background
DrM, Dr. Mueller AGProject Manager-Complex projects
Mar. 2024Elveția
ClimeworksSenior Plant Engineer
Mar. 2022 - Feb. 2024Zürich, Cantonul Zürich, Elveția
Hitachi Zosen InovaSystem Arrangement Planner
May. 2016 - Feb. 2022Zürich Area, Switzerland- Flexibility verification for critical steam piping systems using Rohr2; - Provide supports for non critical piping system;
- Verification of loads on nozzles of HRSG and Steam Turbine equipments;
- Design and drafting special supports-for critical piping systems;
- Selection of spring supports for critical piping systems;
- Provide loads on civil structures according to calculation output;
- Review of main critical system (HP, LP and ByPass valves steam systems); - Routing definition for the Boiler and Steam turbine HP, LP lines;
- PDMS design of civil structures and interaction with Civil department regarding loads on structures and foundations;
- Design of compact Modules for the main pipe rack and WSC systems,
-Coordination and support for the detail engineering suppliers,
-Reviewer of main technical decisions/ direction of EPC projects;
-Creation of internal specifications;
Nov. 2015 - May. 2016Basel Area, Switzerland-Basic design of Flow Metering Skids
-Autocad 3D Plant piping, equipment, steel design,
-Support prefabrication and interaction with suppliers,
-Create and/or verify detail engineering drawings (general arrangements, equipments drawings,piping and instrumentation diagrams, etc.)
-Verification piping stress calculation,
Alstom PowerArrangement and piping engineer
Jul. 2013 - Nov. 2015BadenTzafit Project- Steam Injection-Gas Turbine
Birr4 Project
9E Project- R&D -most compact Power Plant 2 on 1 arrangement Assignments: - Flexibility verification for critical steam piping systems using Rohr2; - Provide supports for non critical piping system;
- Verification of loads on nozzles of HRSG and Steam Turbine equipments;
- Design and drafting special supports-for critical piping systems;
- Selection of spring supports for critical piping systems;
- Provide loads on civil structures according to calculation output;
- PDMS design of piping HP, LP and ByPass valves steam systems ; - Routing definition for the Boiler and Steam turbine HP, LP lines;
- PDMS design of civil structures and interaction with Civil department regarding loads on structures and foundations;
- Design of compact Modules for the main pipe rack ; PHES Project -R&D -Electricity Storage Pumps-Heating high pressure propane
Assignments:
- Flexibility verification for critical piping systems using Rohr2; - Provide supports for non critical piping system;
- Verification of loads on nozzles of different equipments;
- Design and drafting special supports-for critical piping systems; - Selection of spring supports for critical piping systems;
- Provide loads on civil structures according to calculation output; - PDMS design of piping for the entire installation ;
- Design the skid complete installation;
SnamprogettiPiping stress and supports engineer
Sep. 2011 - Dec. 2012Zona metropolitană Mexico City- Flexibility verification for critical piping systems using Caesar2;
- Provide supports for non critical piping system;
- Verification of loads on nozzels of different equipments (pumps, heat exchangers, horizontal vessels);
- Flange verification for critical piping systems;
- Design and drafting special supports-for critical piping systems;
- Provide loads on civil structures according to calculation output
SnamprogettiFIELD Piping Stress and Supports Engineer QAFCO5 Project
Sep. 2010 - Aug. 2011- Assist the construction company in all problems regarding piping and piping supports;
- Modification of standard and special supports according with site conditions;
- Resolve punch items indicated by client inspectors;
- Attendance in official meetings between engineering company and construction company;
SnamprogettiPiping Stress and Supports Engineer (QAFCO5 and QAFCO6 Projects)
May. 2009 - Sep. 2010- Establish axial stop diagrams for critical pipe lines;
- Flexibility verification for critical pipe lines routings using Caesar2;
- Provide supports for non critical piping system;
- Verification of loads on nozzels of different equipments (pumps, heat exchangers, horizontal vessels);
- Flange verification for critical piping systems;
- Design and drafting special supports;
- Provide loads on civil structures according to calculation output.
SnamprogettiPiping Engineer
Nov. 2008 - Jun. 2009Bucharest, RomaniaPosition: Piping Engineer (Engro Pakistan Project) Assignments:
- 3D modelling for different piping systems;
- General arrangement extraction and correction;
- Implementing logical supports from stress and support department to PDS; application as „detail for field”;
- Nozzel orientation for different equipment; - P&ID’s mark-up and updating.
Mar. 2008 - Jul. 2008Grimstad1) Hydraulic calculation: flow of air through 500 meters long Umbilical System connected to an Air compressor from an Oil Platform;
Here I had to determine the losses of pressure, to dimension and optimize the diameter of the umbilical. 2) Calculation (simulation) of sea winds forces on the drilling casings. 3) Develop a Purchase Requisition for a Compressor and in the same time create a date base of possible Compressor Suppliers (I have contacted different Compressor Suppliers and I have received different offers regarding price, size, time of delivering + different technical solutions.
The Badger Company RomaniaMechanical Engineer
Aug. 2007 - Mar. 2008PloiestiIn this company I have done research in order to write my license diploma project entitled: The Design of a Piping System from a Chemical or Petrochemical Plant with Special Analyze of Static and Dynamic Tension State 1) Danielli Corus Project:
In this project I have made change of the routing of an existing manifold (industrial gas).
As well I was responsible for the hanging (support type) for the manifold. 2) OMV Petrom As Built Project.
In this project I performed in the same time field activities (inspection of the installations) and indoor activities (updating the existing P&IDs, Data sheets of the main equipment, equipment list, Plot Plans). 3) Desmet Project: This project consisted in the design of all piping system for the Desmet Biodiesel Plant.
I have performed 3D modelling activities using Cadworx application, produce Isometrics, checking of the Isometrics (handling line numbering and to set up piping line schedules, MTO).
Halcrow RomaniaP&ID Consultant
Apr. 2007 - Jul. 2007PloiestiI was part of a large Project consisting in Updating of 1000 P&ID's for OMV Petrom Romania (the largest Oil Company in Romania). Here I have performed AutoCAD activities and I had to coordinate P&ID’s activities for different offshore area. I carried out my activities in the following: - The transpose of Piping and Instrumentation Diagrams (PID) and Utility Flow Diagrams (UFD) – AutoCAD format
- Realize the equipment list afferent to PID’s and UFD’s
- Realize the query list
Intch is a Professional Networking App for the Future of Work