Work Background
Consultant
Oil & GasConsultant
Mar. 2022Africa
General Operations Manager
Marinas & Co. Builders Inc.General Operations Manager
Feb. 2019 - Apr. 2022Lapu-Lapu, Central Visayas, Philippines
Civil Construction Supervisor
SHELL GabonCivil Construction Supervisor
Feb. 2014 - Mar. 2016Gamba/ Rabi Gabon Central Africa• Manage the contractor in the pre-drilling and post drilling work activities for the well pads in Toucan and Rabi Oilfields. • Responsible for the civil works activities in Rabi • Manage and supervise the contractor in the construction of the Pig Launcher and Receiver for the New Sealine Replacement Project. • Supervise and manage the contractor at the site in the construction of Yenzi Housing Projects Phase 1, 2 & 3. • Supervise and manage the contractor in the black top road campaign in Gamba • Perform pre-commissioning works for the Yenzi House Construction Project • Manage the contractor in the civil works construction and site preparation of the platforms for different wells in Gamba, Ivenga & Totou Oilfields in Gamba, Gabon. • Supervise the contractor in the repair of the 18” Main Oil Line (MOL) from Rabi To Gamba • Coordinate with Shell Topo for the pre-survey works of well site preparation & excavation works and corrosion points (CPs) markers along the Main Oil Line route. • Perform civil maintenance works on Shell’s existing plant at Shell Terminal • Manage and supervise the contractor in the civil works construction of the Aggreko Temporary Power Plant • Ensure that the works at the sites are carried out in a very safe and timely manner • Ensure that the contractors strictly adheres to the project plans and specifications as per Shell Standards • Liaise with HSE in the implementation of the safety policies of the project and the Shell Company management • Ensure that the JHA and Method Statement are relevant to the work activities applied for and are up to date and conforms to the established Shell PTW System • Attend weekly progress meeting
Civil Superintendent - SHAH SULPHUR STATION & PIPELINES PROJECT SGD PKG 11
CH2MHILLCivil Superintendent - SHAH SULPHUR STATION & PIPELINES PROJECT SGD PKG 11
Jan. 2012 - Feb. 2014Abu Dhabi, UAE• Manage the contractor in the construction of the Liquid Sulphur Storage Tanks (6 Nos.) and Desalinated Water Tank in Shah Main Gas Plant, Firewater Tanks (2 Nos.), Utility Water Tanks (2 Nos.), Process Water Tanks (2 Nos.) & Potable Water Tanks (2 Nos.) • Monitor the contractor’s activities in the construction of the Pipeline Corridor, Earthworks, Test Piles and Working Piles, Installation of Overhead Lines and concreting works for the Sulphur Storage Building, Main Access Road, Sub-station Building, IES Building and the Sulphur Station. • Ensure that the contractor’s activities are carried out in a very safe and timely manner with impact to the overall schedule. • Ensure that the work of the contractor is carried out according to the project plans and specifications. • Implement the project HSE Plans. • Respond to contractor’s technical & site queries and other correspondence. • Review and update the construction plans and structural drawings and ensure its implementation by the contractor. • Reports to the Construction Manager to discuss construction work related issues and how to respond. • Ensure that the method statements, testing of materials e.g. soils and concrete are strictly adhered to by the contractor. • Ensure that the materials used by the contractor are as per the Material Approval Request (MAR) • Attend weekly progress meeting with the contractor and safety tool box meeting at the site.
Roads Civil Superintendent - RAW WATER SUPPLY STATION PROJECT
FLUOR MONGOLIARoads Civil Superintendent - RAW WATER SUPPLY STATION PROJECT
Jun. 2011 - Dec. 2011Oyu Tolgoi, South Gobi Desert, Mongolia• Manage the contractor in the construction of a 67 km maintenance track road for the Raw Water Supply Station Project (RWSS) in Oyu Tolgoi, South Gobi desert in Mongolia for the client Ivanhoe Mines Mongolia Inc. • Also manage the contractor in the construction of the raw water main pipeline 900mm diameter ductile pipes, collector tank pump station (CTPS# 1 – 5), break tank pump station (BTPS #1 – 2) sub-stations, switchyard, bore field pump stations, valve boxes, 6.3 kV electric poles and 35 kV steel towers. • Ensure that the work is carried out in a very safe manner and as per the project specifications, plans and drawings and in compliance with the norms and standards of Mongolia. • Monitor the progress of the contractor and ensure that the project procedure, method statements and permit to work system is strictly adhered to. Liaise with the Mongolian government inspection team SSIA with regards to the work quality and workmanship through materials testing, and joint survey checking. • Make daily progress and accomplishment reports. • Attend daily meetings and safety tool box talk with the contractor. • Provide input on how to do the work safely and participate in obtaining analytical solutions to problems at the worksite. • Responsible for contractor’s daily concrete request and liaise such request with the batching plant manager. • Coordinate between the contractor and the blasting superintendent with regards to main pipeline trench areas that require blasting. • Monitor the borrow pits and sand quarries for the materials to be used by the contractor in roads construction and trench backfilling requirements. • Responsible in the application of the Land Disturbance Permits (LDPs) and Land Use Permits (LUPs) for the project and coordinate with the Environmental Department in the implementation of the laws of Mongolia in protecting its environment and national heritage.
Civil Superintendent - URALSK GAS PIPELINE PROJECT
KARACHAGANAK PETROLEUM OPERATING B.V.Civil Superintendent - URALSK GAS PIPELINE PROJECT
Dec. 2008 - Jun. 2011Uralsk, Kazakhstan• Reporting to the Project Manager in the construction of the Uralsk Gas Pipelines Project (UGPP), playing a pivotal role in successful completion to strict deadlines, budgets and specifications • Ensuring full compliance with industry standards and best practice through enforcement of robust systems and procedures and by forging productive working relationships with vendors and contractors • Maximising contractor performance via shrewd management, regular reviews and strict monitoring of contractor activities, including testing of soils, aggregates and concrete specimens • Instrumental in the achievement of outstanding quality and safety standards through regular inspections of all work performed by contractors and vendor equipment • Adopting a logical and professional approach to problem solving and technical issue resolution, working closely with multi-disciplinary teams to ensure projects remain on schedule • Successfully ensuring work scopes, structural design and drawings, manuals and specifications are fully updated, along with ownership of the Design Change Notification process • Driving continuous improvement of working practices, challenging and reviewing methods and procedures to maximise safety, productivity and functionality • Taking the lead in performing in depth design and material conformity surveys, ensuring full adherence to client specifications • Manage and monitor the activities of the sub-contractor on the river crossings using Horizontal Direct Drilling (HDD) method. • Pre-commissioning works on the gas pipelines, air blowing, clean-out by pig method, hydrotesting of main pipelines and purging with nitrogen.
Civil Supervisor - SULPHUR EXPANSION PROJECT
TENGIZ CHEVRON OILCivil Supervisor - SULPHUR EXPANSION PROJECT
Jan. 2008 - Jul. 2008Tengiz, Kazakhstan• Key player in a major design and construction project, facilitating the first phase by managing site preparation and road works in Sulphur Pad 2 of the Sulphur Expansion Project (SEP) • Responsible for contractor activities including removal of sulphur stock materials and preparation of site for soil investigation and survey works • Supporting the SEP Engineering Team by providing technical expertise for site design process and Safety in Design • Effectively coordinating soil investigation drilling works performed by the contractor in advance of new structural works • Collaborating with the SEP Health, Safety and Environmental team to address safety matters and brown field work permit procedures, ensuring all workers are fully conversant with the Permit to Work system
Civil Works Supervisor - SOUR GAS INJECTION PLANT/ SECOND GENERATION PROJECT
PARSONS FLUOR DANIEL INT'L LTD.Civil Works Supervisor - SOUR GAS INJECTION PLANT/ SECOND GENERATION PROJECT
Apr. 2004 - Nov. 2007Tengiz, Kazakhstan• In charge of all contractor civil and structural activities on the Sour Gas Injection Plant and Second Generation Plant construction projects • Managing method statements, risk assessments and safety task analyses, along with toolbox talks, Permit to Work, Safety in Design, punch listing, inspections, verification and sign off • Maximising safe use and functionality of lifting equipment, ensuring full compliance with industry standards and regulations • Successfully managing workforce productivity, responsible for addressing contractor performance and attendance issues • Consider the financial implications of all work undertaken and recommend action which will reduce the cost of any work provided that such action is consistent with the project schedule, accepted engineering practice and will maintain the standard of work required • Ensure Safety in Design norms and standards for reinforced concrete and steel structures such as pipe racks, ladders and cages, handrails, gratings and building structures are strictly observed by the contractor and issue site instructions to contractor for any revisions to work not done accordingly as per the project standards • Ensure that the cranes and other lifting devices and equipments for use by the contractor in the hook up and assembly of structural beams and members for the different building structures are in conformance to the norms and standards of the Republic of Kazakhstan.
Site Engineer / Construction Manager
AL DERBAS ROADS AND MAINTENANCE CO.LTD.Site Engineer / Construction Manager
Dec. 1989 - Mar. 2004Al Khobar, Saudi Arabia• Supervises and controls the construction and asphalting of various roads and highways projects for clients such as Ministry of Communications, Saudi Aramco, Ministry of Aviation and Defense, Saudi Binladin Group, SABIC, and Fluor Arabia • Organize the work and the project team to ensure that the scope of works and specifications are implemented, the project schedule is strictly adhered to and the work is carried out in a very safe and timely manner • Coordinate with the material engineer in establishing strategic locations of borrow pits, review and implement the project specifications and material testing requirements for soils, aggregates, concrete, steel, and hot-mix asphalt as per ASTM Standards, AASHTO Specifications and Marshall Method for the bituminous (4A) and wearing course (6B) as per the Ministry of Communications specifications • Ensure that all materials to be used in the project are suitable and approved by the clients • Manage, plan and implement as per the project schedule the asphalt paving works and ensure the material delivery requirements to the project of 60/70 penetration bitumen so as not to incur delays in the overall project schedule • Liaise with the quantity surveyor regarding quantification of of the project material requirements like A1b and A24 subgrade materials, aggregate base course materials (6F), and component aggregates for the asphalt batching plant logistics. • Liaise with the quarry foreman with regards to the crusher schedule and operations to ensure continous supply of crushed aggregates and sand as per project supply requirements. • Progressing through the ranks on a wide range of road and highway projects for various clients in the Eastern Province • Driving successful site development, mass landfills, planning and delivery via a high performing project team • Coordinating method statements, risk assessments, job safety analyses, work permits, project schedules and testing.
Material Engineer / Civil Engineer
AL HINDI COMaterial Engineer / Civil Engineer
Mar. 1988 - Sep. 1989Al Khobar, Saudi Arabia• Responsible in the testing of materials such as soils, aggregates, concrete using ASTM standards and also Hot-mix asphalt using AASHTO specifications and marshall method • Perform field density tests at the site using sand cone method and troxler as required • Perform tests on soils and aggregates to determine proctor value by rammer method for subgrade and aggregate base course materials • Perform bitumen extraction on hot-mix asphalt sample to determine its content • Perform sieve analysis on soils and aggregates to determine the percentage composition of every aggregate size by weight • Perform Los Angeles Abration test on aggregates • Perform Liquid Limit and Plastic Limit Tests on soils

Requests

Touchpoint image
22
Personal Pitch
Construction Supervisor Offer
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Mario on Intch
Engineer
83610 people
24
Technology Solutions Architect @ Consultant - Asia Development Bank
32
Founder/CEO @ SABPPTECH SERVICES INC
22
Director - Project Management @ AP Investment
EngineerCivil engineer
8075 people
22
Director - Project Management @ AP Investment
26
COO & Co-Founder @ Say Lava Logistics Corp.
33
Civil Engineer @ B Squared Construction