ArcadisAssistant Hydraulics Design Engineer
Apr. 2018 - Dec. 2018ManilaProject Handled: * Dubai Hills Estate Mall, Dubai, UAE
* SFMC Hospital Building Riyadh, KSA
* Dubai Creek Harbour Development, Plots 20-21, Dubai, UAE
* Dubai Creek Harbour Retail District, Dubai, UAE: * Tilal Mall, Sharjah, UAE * Qatar Children’s Museum, Doha, Qatar: * City Tower 1, Dubai, UAE
* Matajer Al Musalla Duties & Responsibilitie * Drew mark ups for Drainage, Water Supply, Rainwater and Gas layout
* Drew Schematics for Drainage, Water Supply, Rainwater and Gas
* Compiled drawing details to be used in projects.
* Calculated drainage pipe sizing, manhole schedules, pump equipment schedules, water supply sizing, lpg gas pipe sizing, rain water pipe sizing and gutter sizing.
* Modeled Drainage, Water Supply, Gas and Fire Protection piping.
* Modeled and drawn detail of Water Tank, Fire Tank, Condensate Tank, TSE Tank, Grease Interceptor and Grey water Treatment Plant.
* Coordinated with different trades to resolve clashes in MEP services.
* Checked the 3D model using Naviswork
* Assisted BIM modelers on BIM modelling jobs regarding Plumbing/Public Health and Fire Protection design.