Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Network Power<100 people
Roles
100%
Business Owner
🧑‍🔬100%
Engineer
Geos
🇮🇳100%
India
Work Background
RDI Specialist - Arctic LNG 2
Novarctic SNCRDI Specialist - Arctic LNG 2
Jun. 2020 - May. 2022Belgrade, Centralna Srbija, Serbia- Ensure correct receipt and understanding of the information of Steel Subcontractors - Control that targets on quality and schedule for detail design are maintained. - Ensure that quantities are revised and updated each month all along with the project. - Review with SUBCONTRACTORS RDIs the weekly and monthly Engineering progress data. - Solve technical issues with STEEL SUBCONTRACTORS in coordination with Specialist in Moscow operating Center - Control 3D model progress and production curves for the documentation. - Answer and solve some technical queries issued by the steel Subcontractor - Report each week, with a brief summary: weekly progress, cumulated progress, planned progress.
Founder/Owner, Structural Engineer
Steel DesignFounder/Owner, Structural Engineer
May. 2020Belgrade, Serbia• Design of steel (80%), concrete (15%) and wooden (5%) structures • Communication with the Client and the Architect, conceptual design, structural analysis and connection design with reports, workshop and erection drawings, 24/7 support for fabricator The latest ref: 1. Factory Continental Kać, Novi Sad, Serbia - 110t of secondary steel structures: façade, platforms, external stairs, ramp for forklifts, attics, inner gallery etc. (detailing and connection design with reports, workshop and erection drawings, design with structural analysis for several structures) 2. Factory Hansgrohe Valjevo, Serbia - 88t of secondary steel structures: (detailing, workshop and erection drawings) 3. Core Recreation Center, California USA, 54.000 sq. ft. 565.000lbs (workshop and erection drawings + structural analysis for three stairs), 4. Static check of wind turbines acc. to Eurocode (H1 = 125m, H2=118m) at Crni Vrh, Serbia 5. Factory Nestle, Belgrade, Serbia - 55t of secondary steel; 6. James Foster Elementary school, California, USA, 40.000 sq. ft. 610.000lbs (workshop and erection drawings), 7. Various steel structures for Congress Centre Sava, Belgrade, Serbia (frame and floor structures, antenna carrying girders, chiller carrying platform, floor slab reinforcement). Total weight: ~80t 8. Industrial building in Glamocani, RS, Span: 25m, 45t 9. Pile foundations for transmission towers, Serbia, 10. Design of roof structure for a football stadium in Bijeljina, RS, Span: 34,5m 11. Sports hall in Gruza, Serbia, Roof steel structure, Span: 27m, Area: 1670m2 12. Steel structure of façade for Hospital “Sveti Apostol Luka’’ in Doboj, RS. 40t of steel spatial structures; max span: 18m 13. Two industrial steel buildings in Sipovo, RS, Total area: 2200m2 14. Steel structure of public monument for city square in Leskovac, Serbia. H=15m 15. Reinforcement of concrete floor slabs with carbon fibers in residential building in Obrenovac, Serbia 16. 10+ fair stand structures German market - etc.
Senior Structural Engineer
Kodar EnergomontazaSenior Structural Engineer
Dec. 2018 - Jun. 2020• Design of steel and concrete structures according to JUS and Eurocode. • Monitoring deadlines and managing work of other colleagues. • Assisting to colleagues during production and erection of structures. • Software: SOFiSTiK, STAAD.Pro, Matrix Frame, Tower Radimpex, AutoCAD, Advance Steel Projects: 1. Meteorological guyed mast in Pancevo, Serbia. Height: 160 m 2. Meteorological guyed mast in Zagubica, Serbia. Height: 110 m 3. Several antenna towers – ‘’greenfields’’ in Netherlands (around 10 projects). Heights: 30-45 m 4. Several antenna carriers – ‘’rooftops’’ in Netherlands (more than 20 projects). Heights: 5-10 m 5. Several telecommunication towers for Serbia (around 10 projects). Heights: 5-45 m
Site Engineer
ZGP BeogradSite Engineer
Sep. 2018 - Dec. 2018• Organization of the construction site. • Monitoring of deadlines. • Providing technical solutions in cooperation with designer and investor. • Organization of the workforce, issuing work orders. Projects: 1. Reconstruction of the road bridge in Rudnik, Serbia. Span: 6+40+6 m 2. Reconstruction of the road bridge in Kraljevo, Serbia. Span: 13x18 m = 234 m
Structural Engineer
DEL ING DOOStructural Engineer
Oct. 2014 - Mar. 2018Belgrade• Design of steel, concrete and timber structures according to JUS, Eurocode and GOST. • Structural analysis report was written in Serbian, English and Russian. • Cooperation with architects, technicians, engineers from other fields. • Correspondence with client, investor, erection company representatives in Serbian, English and Russian. • Monitoring deadlines and managing work of other colleagues. • Software: SOFiSTiK, STAAD.Pro, Tower Radimpex, AutoCAD, ConSteel. • For some projects listed below I was a member of the design team, for others lead designer. Projects: 1. Guyed masts in Kikinda and Sombor. Height: 115m 2. Steel towers for wind turbines in Pancevo. Height: 117m 3. Thermal power plant ’’Nikola Tesla’’ in Obrenovac, Serbia – reconstruction of the steel structure. Height: 137m 4. Footbridge on Kopaonik – composite bridge structure. Span: 10+61+10m 5. Two railway bridges in Krnjaca. Spans: 10,5+24+14,5 m and 17,5+25,5+20,5 m 6. Road bridges across Bosut and Studva in Morovic – reconstruction. Spans: 38+69+38 m and 31,5+56+31,5 m 7. Temporary steel bridge across Moracica in Bioce, Montenegro. Length: 102,25 m 8. Cofferdams for the bridge across Sava rover in Obrenovac 9. The steel structure of facade for SKOLTECH in Skolkovo, Russia. 1145 tons of steel structures, 1042 erection drawings 10. Steel structures for hospital ’’Мать и Дитя’’ in Samara, Russia. Steel structures of: 3 technical rooms, the roof of the conference hall, 2 skylights, 2 elevators shafts, 2 canopies 11. Roof Structures for theatres ’’Мечта’’ and ’’Орбита’’ in Moscow, Russia. Roof surface area: 1420 + 1440 m2 12. Steel structures for railway station ’’Prokop’’ in Belgrade. Structures of: roof of the station building, facade, platform shelters, 2 elevators shafts, indoor and outdoor footbridge 13. Ski-lift Zlatibor-Tornik on mountain Zlatibor. Structures of: ski-lift’s columns and foundations, two garages and three structures of stations 14. Roof structures for houses made of timber
Structural Engineering Intern
DEL ING DOOStructural Engineering Intern
Jun. 2014 - Jun. 2014Serbia, BelgradeDesign of composite floor construction according to Eurocode.
Structural Engineering Intern
CTICM Middle EastStructural Engineering Intern
Jul. 2013 - Aug. 2013Lebanon, BeirutDesign of steel structure of silo for storing cement according to Eurocode. Dimensions: diameter 20m, height 30m.

Requests

Touchpoint image
3
Personal Pitch
Conceptual Solutions, static analysis,connection checks & Detailed workshop and erection documentation #steel structures
Touchpoint image
3
Looking for a Job
Steel Structures Drafting Expertise
Touchpoint image
5Applied by 1
Looking for a Job
Steel Structures #calculations, connections #3D Modeling & Drafting
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Ivan on Intch
Engineer
207680 people
16
Company owner @ Vox Net LLC
22
QA lead @ Phrase
15
Sales and Marketing Manager @ Katalog
EngineerCivil engineer
22307 people
35
Civil Structural Engineer @ Masinoprojekt
18
Civil Engineering
21
Co-founder - Tehnical director @ Enservic