Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Network Power<100 people
Roles
✔️100%
IT
Geos
🇳🇿100%
New Zealand
Work Background
DanoneIT & Data - Regional (AMEA & GCO) Solutions Lead - Design to Delivery (D2D) - Integration
Jan. 2022Kuala Lumpur Hub (Asia Middle East Africa & Greater China Oceania)Drive system integration and Master Data Management, include the process digitalization & transformation across the Business Units in Asia Middle East Africa & Greater China Oceania.
DanoneLBT APAC - Business Process Manager - Integration & Master Data
Oct. 2011 - Jan. 2022Asia PacificDrive system integration and Master Data Management, include the process transformation across the Business Units in Asia Pacific.
Astra Graphia Information Technology (AGIT)SAP MM, WM, LE, PM, BW/BI and SAP Operation Support Consultant
Apr. 1999 - Oct. 2011
Astra Graphia Information Technology** SAP BI-BO Implementation at Astra Daihatsu Motor
Jul. 2011 - Sep. 2011- Develop Dashboard using XCelsius (SAP BO Dashboarding)
- Develop (ETL) SAP BW Reporting (Logistic area)
- Query Designer
Astra Graphia Information Technology** SAP BI-BO Implementation & SAP HR Upgrade at Bank BII
Jan. 2011 - Jun. 2011- Implementation of SAP BI.7 & BO XI3.1 (GoLive: 30 May 2011)
- Upgrade of SAP HR ECC5 to ECC6 (GoLive: 15 April 2011)
Astra Graphia Information Technology (AGIT)** SAP MM - Inventory Management at Indosat
Oct. 2010 - Dec. 2010Implement SAP MM - Inventory Management System which linked to SAP Project System
Astra Graphia Information Technology (AGIT)** SAP Upgrade Project at PT.Toyota Astra Motor
Aug. 2010 - Oct. 2010Industry: Manufacturing
Project Scope: SAP MM, SD, SM, FICO and LE (Upgrade from SAP 4.6C to SAP ECC 6)
Assignment: MM Module
Role: SAP Functional Team Leader
SAP MM Functional
Responsibility: Manage and do Upgrade and Migrate testing and configuration in SAP Functional area Brief Responsibility
- Plan and Execute Upgrade and Migrate Activity in SAP Functional area
- Ensures all design and prototype outputs well designed, configured and documented
- User Acceptance Test
- User authorization setting and testing
- Create User Manual and End-User Training for Delta Upgrade and Migrate
Astra Graphia Information Technology (AGIT)** SAP Project at PT.United Tractors (SAP AllMakes Project)
Jan. 2010 - Jul. 2010Industry: Heavy Equipment
Project Scope: SAP R/3 (MM, WM, LE, SD, FICO)
Assignment: MM, WW and LE Module
Role: Team Member
Responsibility: Design and Technical Configuration Brief Responsibility
- Capture Blueprint requirement with user
- Ensures all design and prototype outputs well designed, configured and documented
- User Acceptance Test
- User Training
- User authorization setting and testing
- Create User Manual and End-User Training
Astra Graphia Information Technology (AGIT)** SAP Operation Support at Astra Automotive Manufacturing (ATPM)
Sep. 2009 - Dec. 2009Industry: Manufacturing
Project Scope: SAP Development and Support
Assigment: SAP Logistic
Role: Team Member
Responsibility: Design and Technical Configuration Brief Responsibility
- Develop user Change Request
- Ensures all design and prototype outputs well designed, configured and documented
- User Acceptance Test
- User authorization setting and testing
- Create User Manual and End-User Training
- Include: SAP Production Process Improvement (SAP PP Module) in PT.Gaya Motor (Astra Automotive Car Assembler)
Astra Graphia Information Technology (AGIT)** SAP Plant Maintenance Project at PT. Inti Pantja Press Industri
Apr. 2009 - Aug. 2009Industry: Manufacturing
Project Scope: SAP R/3 Module (PM, MM, FICO)
Assignment: PM, MM Module
Role:
SAP Project Manager
SAP PM and MM Functional
Responsibility: Manage Project; Design and Technical Configuration Brief Responsibility
- Capture Blueprint requirement with user
- Ensures all design and prototype outputs well designed, configured and documented
- User Acceptance Test
- User authorization setting and testing
- Create User Manual and End-User Training
Astra Graphia Information Technolgy (AGIT)** SAP BW/BI Project at PT.Telekomunikasi Indonesia
Sep. 2008 - Mar. 2009Industry: Telecommunication
Project Scope: SAP NetWeaver 2004s – BW/BI (Finance & HR Reporting)
Role:
Team Member of Application Development
Team Leader of User Acceptance Test
Responsibility: Design, Modelling, Extraction, Reporting, Documentation Brief Responsibility
- Capture BI/BW Business Process requirement with user
- Ensures all design and prototype outputs well designed, configured and documented
- User Acceptance Test
- User authorization setting and testing
- Create User Manual and End-user Training
Astra Graphia Information Technology (AGIT)** SAP BW/BI Project at PT.Excelcomindo Pratama
Feb. 2008 - Aug. 2008Industry: Telecommunication
Project Scope: SAP NetWeaver 2004s – BW/BI (Procurement & Logistic Reporting)
Role: Team Member
Responsibility: Design, Modelling, Extraction, Reporting, Documentation Brief Responsibility
- Capture BW/BI Business Process requirement with user
- Ensures all design and prototype outputs well designed, configured and documented
- Create 32 of 78 Total Query Designer, 70 of 80 Total WAD (Web Application Designer) in project and link it to SAP Enterprise Portal
- User authorization setting and testing
- Create User Manual and End-user Training
Astra Graphia Information Technology (AGIT)** SAP Operation Support at Astra International Groups of Sales Operation
Apr. 2003 - Feb. 2008Industry: Automotives
Project Scope: SAP Development & Support (MM, WM, SD, PMSM, FICO, BW, CRM)
Assignment: MM, WM and LE Module
Role:
SAP Development & Operation Support All Business Coordinator (July 2006 – February 2008)
SAP Operation Support All Business Coordinator (April 2005 – June 2006)
Spare Parts Business Process Team Coordinator (April 2004 – March 2005)
Spare Parts Business Process Team Member (April 2003 – March 2004) Brief Responsibility - Manage and support PT.Astra International,Tbk’s SAP Development and Operation for 2500 SAP Users around Indonesia.
- Manage SAP Support Team (10 person) and SAP Development Team (12 person)
- Achieve SAP Customer Competence Center Certification (SAP CCC) for PT. Astra International’s SAP Support Center organization. This certification gift in 5th SAP CCC Info Forum in Singapore, August 2005
- Review and monitor SAP Project Handover activities. More than 15 PT. Astra International’s SAP Projects to SAP Operation activity (i.e. SAP R/3 Project Roll-Out, SAP Upgrade, SAP New Dimension Implementation (CRM, BW), some small SAP Projects)
- Manage SAP (R/3, BW, CRM) Change Request and New Request implementation (75 to 100 New-Change Request / month)
- Manage SAP (R/3, BW and CRM) Daily Operation (about 1500 Ticket / month, before: about 2500 Ticket/month -> reduced by ± 40%). - Evaluate and give solution of SAP Operation problem follow SAP CCC Operation Standard.
- Periodically execute DRC (Disaster Recovery Center) simulation activity
- Plan and review End-User training and refreshment training activities.
- Give advice and execute SAP Business Process Improvement
- Others: Implement and Use Microsoft Project 2007 - Enterprise at PT. Astra International
PT. Astra International** SAP Project at Isuzu Sales Operation (SAP Pygmalion - ISO Project)
Aug. 2002 - Mar. 2003Industry: Automotives
Project Scope: SAP R/3 module MM, WM, SD, LE, PMSM, FICO
Assignment: MM and WM Module
Role: Spare Parts Business Process Team Leader
PT. Astra International** SAP Project at Honda Sales Operation (SAP Pygmalion - HSO Project)
Jun. 2001 - Jul. 2002Industry: Automotives
Project Scope: SAP R/3 module MM, WM, SD, LE, PMSM, FICO
Assignment: MM and WM Module
Role: Spare Parts Business Process Team Leader (October – July 2002)
Spare Parts Business Process Team Member (June – October 2001)
PT. Astra International** SAP Project at Toyota Sales Operation (SAP Pygmalion - TSO Project)
Mar. 2000 - Apr. 2001Industry: Automotives
Project Scope: SAP R/3 module MM, WM, SD, LE, PMSM, FICO
Assignment: MM Module
Role: Team Member of Inventory Management
and Data Conversion
PT. Astra International** SAP Project at PT. Pantja Motor (Isuzu – Logistic Component)
Nov. 1999 - Feb. 2000Industry: Automotives
Project Scope: SAP R/3 module MM, SD, LE, PP, FICO
Assignment : MM Module
Role: Inventory Management Team Member
PT. Astra International** SAP Project at BMW & Peugeot Sales Operation
Apr. 1999 - Nov. 1999Industry: Automotives
Project Scope: SAP R/3 module MM, SD, LE, FICO
Assignment: MM module
Role: Procurement & Inventory Team Member
Pama Persada NusantaraGold Mining Project at PT. Indomuro Kencana (Aurora Group)
Jun. 1995 - Oct. 1996Industry: Mining
Role: Maintenance Supervisor of Mining Heavy Equipment
Intch is a Professional Networking App for the Future of Work