CEPSAIntern at Cepsa/ Non Operated Assets
Jan. 2015 - Jul. 2015Bogota-Colombia• During the internship in the non-operated assets in Cepsa Colombia, the correct creation and use of databases, allowed to analyze key performance parameters, behavior of wells, and thereof ensure an average output of 7000 barrels per day.
• Assisted the design of the field development plan for the La Canada Norte field, led to decide proper production systems, best well placement, and predict production potential under different scenarios.
• Supported detailed analysis of production history through OFM software, conducted to generate well declining curves to estimate possible profiles of the reserves.
• Evaluated surface reports with senior engineers pointed to generate improvements in the production methods.
• Prepared, applied and submitted documentation and communications for state regulatory agencies, associations, partners and others.