Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Work Background
Loadmaster
NOVA ENERGIESLoadmaster
Sep. 2022Murmansk, RussiaOrganized, manage, calculate, and leading people for load out and load in activities that involves with heavy module of oil and gas structure
Modules Erection Method Engineer
SaipemModules Erection Method Engineer
Nov. 2020 - Aug. 2022Murmansk, RussiaModule Fabrication Method Engineer at SAIPEM (Murmansk - Russia) for ALNG 2 Topside project. Job description as follows: • Analyze and develop fabrication procedures, study and define operations for structural components integrity in temporary intermediate conditions like lifting and handling of subassemblies or load out, develop and issue calculations and procedure for fabrication, lifting, handling in particular for the Steel Fabrication phase • Support yard fabrication activities providing assistance as needed • Participate to prepare the erection / construction sequence / method statement for the fabrication and assembly phase of the sub-decks • Define and finalize systems details for any type of transport / transfer in the yard and between the workshops • Define and finalize systems details, structural verifications and analysis for critical lifting operation, prepare and issue of calculation reports. Define and prepare the subcontractor scope of work for structural studies related issue • Study, define the method procedures, dedicated tools and equipment of the critical operations like Heavy lifts, Roll-ups, Weighing and Load-out • Prepare and issue the procedures for Heavy lifts, Roll-ups, Weighing, Load-out applicable for the erection of Modules • Participate in critical operations like Heavy lifts, Roll-ups • Ensure the interfaces with the Construction team (HSE coordinator, Quality Control coordinator, Prefabrication and Erection functions) and assist it as needed • Participate to prepare the HSE Plan for every critical operations like Heavy lifts, Roll-ups • Ensure the interfaces with the Client and/or Subcontractor Engineering / Methods department and check the conformity and congruence of technical documentation received from Head Office, Clients and Subcontractors • Analyze the technical aspects of the feasibility of the construction works providing information on the actual on-site availability of facilities, tools, documents, materials, etc.
Senior Method Engineer
Bos-ShelfSenior Method Engineer
Apr. 2018 - Nov. 2020Salyan Highway, BDJF Yard. AzerbaijanJob descriptions as Senior Method Engineer are as follows: • Assist any bidding works related with fabrication sequence, man hour allocation, yard layout, especially for Top Side and Jacket. • Allocation of lifting and transportation equipment during bidding • Prepare any method statements and any clarification with client • Same other job description that experienced before as Senior Method Engineer at Bos-Shelf
Senior Structural Engineer
Mcdermott Middle EastSenior Structural Engineer
Aug. 2016 - Aug. 2017Dubai Emirate, United Arab EmiratesSenior Structural Engineer at McDermott middle east (Dubai) Construction Support Engineering (CSE) Department for ARAMCO and RAS GAS project (Deck, Jacket, Bridge, and Boat landing). Job descriptions as Senior Structure Engineer are as follows: • Produce procedure preparation and any calculation related with critical lifting (lift weight above 100 MT, multi crane lifting more than 2, or critical to the project). Including design of rigging, lifting attachment, crane design (radius, ground bearing, etc.), and structural integrity. • Produce procedure for loadout and all necessary calculation related with loadout activity, including lifting, trailer (SPMT), and skidding loadout. The calculation including crane capacity, stability, ground bearing check, quay wall check, SPMT capacity and stability, ramp plate check, ballast calculation, mooring design, etc. • Prepare transportation analysis utilizing SPMT with trailer frame, which cover trailer frame calculation, SPMT capacity and stability, etc. • Design temporary support, including for jacking support, etc.
Construction Engineer
PTTEPConstruction Engineer
Apr. 2013 - Apr. 2014SingaporeClient representative for Zawtika project for gas field development project located in the Gulf Moattama, Myanmar. Topside is being made at SMOE Singapore which is also consist of CPP, LQM and Flare boom. Responsible to review and escorting fabrication by SMOE to meet PTTEP criteria and achieve design life until 30 years, especially related with lifting, jacking, weighing, and loadout activity Involve in hook up activity and acting as inspector coordinator
Construction Engineer Leader
McDermott International, LtdConstruction Engineer Leader
Jun. 2008 - Apr. 2013Batam, IndonesiaSummary of duties and responsibilities: Responsible for coordinate, supervise, and manage team of construction engineers, to meet procedure deliverable schedule and well executed during execution. In addition, make sure the project is executed with the most effective method that can cause less time consumption and hopefully less cost impact. Moreover to estimate and controlling man-power and also man-hour for the specific project that being assigned to. Major projects involvement: [Maersk FPSO module] The FPSO system consists of a new build FPSO Hull. FPSO Topsides consist of 10 modules of fabrication with total 6500 MT, with the heaviest one approximately 1500 MT weight. [Chevron LQ, Flare, and Bridge] McDermott had opportunity to have all of EPCI process for this project. A lot of challenges need to be solved during construction, especially for reducing man hour of fabrication. Therefore flip over LQ jacket with weight approximately 800 MT lift weight is introduced, with other efficiency method. [Vetcogray Subsea Structure] Gorgon upstream is a phased development of the Gorgon and Jansz fields. The development is based on subsea production and control equipment with a single multiphase pipeline from each field. The two fields will be tied back to the shore facility at Barrow Island by individual static umbilical. The design will provide for future tie-in of compression facilities. Design life will be 50 years for non-replaceable structures. All facilities will be designed keeping life cycle cost in mind and using minimum- manning concept consistent with safe and efficient operating practice and the required plane availability. This implies a philosophy of minimum complexity, maximum reliability and unattended operation wherever possible.
Construction Engineer
PT. McDermott IndonesiaConstruction Engineer
Feb. 2006 - Jun. 2008Batam, IndonesiaSummary of duties and responsibilities: Responsible for designing and make sure the structure is execute-able by rolling up, stacking, or other process. The design will always meet McDermott batam maximum capabilities, including lifting gear and accessories. As construction engineer has basic skill, but not limited to the following activities: 1. Design spreaderbar, temporary support, padeye, trunnion, tieback, etc (based on ASD and API standard). 2. Responsible for critical lifting (weight over 100 MT) procedure, for example stacking module, roll-up Jacket Bent, roll-up and lifting horizontal panel for jacket, etc. 3. Responsible for mooring line and ballast analysis for loadout. 4. Study for production ability of jacket or deck for bidding. 5. Responsible for transportation of module. 6. Determining crane arrangement for stacking, roll-up, etc. 7. Determining rigging arrangement for stacking, roll-up, etc. 8. Design pressure vessel for internal use. Major projects involvement: [Woodside phase V module]. PTMI Fabricated 75 onshore modules for the train V project, with 16 shipments. Woodsides train V total weigh is estimated 20,000 tons with 2000 tons of the heaviest module (25mX36mX36m) and 1375 tons of the largest module (52mX29mX26m), with total 4.2 million estimated of man-hour. [Su Tu Vang Jacket]. The jacket is one of the new challenges in McDermott batam, since it is vertical jacket with weight approximately 4079 MT. The Roll-up process is not common, since we combine it with lifting process during installation of center box. Meanwhile, Installation of J-Tube or riser encourages becoming more creative since the final position is vertical instead of horizontal.

Requests

Touchpoint image
941
Looking for a Job
Senior Method Engineer: A Proven Leader
Touchpoint image
257
Personal Pitch
Engineering Excellence in Oil and Gas Structures
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Rizky on Intch
Engineer
500641 people
16
Full Stack Developer & RPA Engineer @ Sinergi Informatika Semen Indonesia
45
Software engineer
20
Sr.Engineer (Performance Lead) @ PT. NEC Indonesia
EngineerCivil engineer
62450 people
16
Construction Project Manager
17
Drafter/Designer
20
Virtual assistant / Project manager / Process improvement