Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Work Background
Principal Consultant
Atlas Green WorksPrincipal Consultant
Jul. 2017 - Nov. 2013Greater Los Angeles AreaPrincipal Consultant Atlas Green Works - Los Angeles, CA 2017 to Present • Construction/Project Management and Urban Design/Planning for agencies and non-profits. Projects included: o Wrigley Greenbelt Project – $4M budget. 6-acre 1mile long Greenbelt. Project elements included decomposed pedestrian path, dry stream beds, 80 station solar powered low flow irrigation system, 117 – 15 gal. trees & 15,000 – 1gal. native/indigenous plants o Heritage Point Park Project – $2.5M budget, 5-acre urban park created in the middle of an active oil field. Project elements included concrete and decomposed pedestrian walking paths, rest areas with interpretive signs and basalt benches, cut stone retaining walls, drainage system/bioretention basins/dry well, irrigation and planting o Parque Dos Rios Habitat Restoration Project - $1M habitat restoration project
President
Atlas Green WorksPresident
Jul. 2017Dallas-Ft. Worth MetroplexPrincipal Consultant Atlas Green Works - Los Angeles, CA 2017 to Present • Construction/Project Management and Urban Design/Planning for agencies and non-profits. Projects included: o Wrigley Greenbelt Project – $4M budget. 6-acre 1mile long Greenbelt. Project elements included decomposed pedestrian path, dry stream beds, 80 station solar powered low flow irrigation system, 117 – 15 gal. trees & 15,000 – 1gal. native/indigenous plants o Heritage Point Park Project – $2.5M budget, 5-acre urban park created in the middle of an active oil field. Project elements included concrete and decomposed pedestrian walking paths, rest areas with interpretive signs and basalt benches, cut stone retaining walls, drainage system/bioretention basins/dry well, irrigation and planting o Parque Dos Rios Habitat Restoration Project - $1M habitat restoration project
Community Development Director and Project Manager
Los Angeles Conservation CorpsCommunity Development Director and Project Manager
Nov. 2013 - Jun. 2017Greater Los Angeles Area• Project Management for public works, park construction, environmental/urban planning projects. Projects included: o Laurel Canyon Blvd Green Street Project - $4M budget. ¼ mile of engineered vegetated bioretention basins & 8 dual chamber dry wells that collected stormwater runoff from a 120-acre sub-watershed area o San Pedro Urban Greening Implementation Plan - $150K budget. Project resulted in an Implementation Plan that provided green space linkages from the San Pedro waterfront to the hills • Business Development for both new public works, parks, and urban forestry projects, and for additional funds needed to complete existing project
Executive Director
North East TreesExecutive Director
Jul. 2004 - Jan. 2009Los Angeles, California, United States• Business Development/Fundraising for stormwater management BMPs and parks construction project – raised $10M funds for parks/green streets projects and organization operations; increased annual revenue by 300% • Project Management for stormwater management projects, including: o Oros Green Street – $1.2M budget. First Green Street Project in City of Los Angeles; resulted in creation of a City of Los Angeles Low Impact Development Ordinance and Green Streets & Green Alleys Design Guidelines Standards • Marketing & Branding – Green Way LA Branding & Marketing Campaign – logo & website design • Finance Management – balance sheets, profit/loss, cash flow analysis • Senior Staff Management
Principal
L.E. Smith ConsultingPrincipal
Jul. 2000 - Jun. 2004Los Angeles, California, United States• Public Works Management Consulting Services. Projects included: o Preparation of Honolulu Tropical Urban Forest Master Plan & development and configuration of Honolulu Urban Forest Asset Management System (Cartegraph software) - $150K budget
Principal Consultant
L.E. Smith ConsultingPrincipal Consultant
Jul. 2000 - Jun. 2004Los Angeles, California, United States• Public Works Management Consulting Services. Projects included: o Preparation of Honolulu Tropical Urban Forest Master Plan & development and configuration of Honolulu Urban Forest Asset Management System (Cartegraph software) - $150K budget
Western U.S. Regional Municipal Market Manager
Davey Resource Group, A Division of The Davey Tree Expert CompanyWestern U.S. Regional Municipal Market Manager
Dec. 1995 - Jun. 2000Western United States - based in Los Angeles, CA• Responsible for municipal market business development and project management west of the Rocky Mountains • Projects included: o Honolulu GIS-based Street Tree Inventory - $250K budget o Los Angeles Street Tree Inventory – $2M budget for inventory of 800,000 street trees o Long Beach Street Tree and Public Infrastructure Inventory – $250K budget for project designed to provide sidewalk, curb & gutter damage & tree inventory data to facilitate equitable distribution of City budget $ for infrastructure repair o Lake Forest Urban Forest Inventory and Master Plan - $100K budget. Purpose to ascertain magnitude of damage from insects to a sector of the urban forest and recommend replacement tree species
Principal
Smith-Eitner ConsultingPrincipal
Sep. 1993 - Dec. 1995Greater Los Angeles Area• Urban Design and Landscape Design Services – Projects included: o NoHo Arts District Planning Study o Work Plan for NoHo Arts District Los Angeles Neighborhood Initiative (LANI)
Senior Urban Designer
AECOM - Daniel, Mann, Johnson, Mendenhall (DMJM)Senior Urban Designer
Jan. 1989 - Dec. 1993Greater Los Angeles Area• Project and Construction Management Services and Urban Design. Projects included: o 23-mile Los Angeles to Long Beach Blue Line Light Rail Landscape Design & Construction Project - $20M budget o Preliminary Engineering for 184 Street Mile “Greater Los Angeles Electric Trolley Bus (ETB)” Project - $11M budget o Design Development and Construction Documents for 4.3 mile Long Beach Anaheim Street Electric Trolley Bus (ETB) Prototype Construction Project – $10M budget
Project Manager, Senior Urban Designer
AECOM - Daniel, Mann, Johnson, Mendenhall (DMJM)Project Manager, Senior Urban Designer
Jan. 1989 - Jan. 1993Greater Los Angeles Area• Project and Construction Management Services and Urban Design. Projects included: o 23-mile Los Angeles to Long Beach Blue Line Light Rail Landscape Design & Construction Project - $20M budget o Preliminary Engineering for 184 Street Mile “Greater Los Angeles Electric Trolley Bus (ETB)” Project - $11M budget o Design Development and Construction Documents for 4.3 mile Long Beach Anaheim Street Electric Trolley Bus (ETB) Prototype Construction Project – $10M budget
Sr. Estimator, Design-Build Sales
American Landscape Inc.Sr. Estimator, Design-Build Sales
Jan. 1986 - Dec. 1989Greater Los Angeles Area
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Larry on Intch
Consulting
1128203 people
21
CEO / Leadership Coach / Career Strategist / Instructional Designer / Curriculum Consultant @ Expanding Leaders
15
Project Manager, Consultant
15
Production Assistant
ConsultingAssociate
111615 people
15
Production Assistant
21
Dynamic Creative and Leader @ Freelance (Self employed)
16
Outside Sales Manager @ Tyson Foods