Offshore Shukheir oil Company. (Osoco)petroleum engineering department head
Jan. 2021Cairo, Egypthandling and supervising the following: (Water Shut-off, wireline operations include open hole logging - cased hole Logging-perforation-testing, Coiled tubing operations, TCP, Surface well Testing, Slick Line Operations) •well completion design including (open-hole and cased hole gravel pack, Horizontal completion including ICDs, ESP and gas lift completion installation). •well modeling through prosper software) •sand management including production forecasting, production control and monitoring. •preparing tender package and performing market survey. •Well Integrity management systems - design, guidelines and procedures. •well intervention remedial actions for production enhancement (work-Over, rig- less interventions). •handling well intervention jobs for wells with high H2S (60 PPM).