KAPLAM PLASTİK SANAYİ ve TİCARET A.SMethods & Engineering Chief
Jan. 2017 - Feb. 2024•I was responsible for Method and Engineering Activities and a member of the R&D team as a Design Responsible.
•Managed 3 white collar employees.
•Prepared technical feasibility reports for all RFQ studies.
•Managed plastic part design processes.
•Managed all packaging designs and investments.
•Prepared yearly direct labor budget and managed improvement studies.
•Managed plant current and future layout studies.
•Managed capacity analysis and determined new machine investments.
.Led all Injection machine and equipments setups.
•Led project planning and project management of capital upgrades to the plant.
•Prepared all technical specifications for assembly benches, poka yoke machines, grippers, etc. and
managed the entire manufacturing phase with suppliers.
•Managed commissioning of a 4 million Euros production and assembly line for a German customer (V710
AGS Project).
•Managed design and production of over 15 assembly benches, 10 poka yoke benches, and 15
metalization jigs for V710, CX740, J74, and V769 projects worth 1.2 Million Euros.
•Managed the Design and development processes of V769 Front Wheel Archliner part for Ford as codesign supplier using CatiaV5 and Ford Teamcenter System (FSS).
•Managed 11 molds, 3 US Welding machines, and 5 assembly lines of Fiat X250 and Renault X62 projects
for the Italian customer (Blinker Lighting Parts).
•Managed design and production of over 20 assembly benches, 25 poka yoke benches, 34 metalization
jigs, and 8 robot arms for FIAT 356MCA, Hyundai AC3/BC3, Renault CMFB/CMF1, Ford V362 MCA/V363
MCA, Fiat X250, Renault X62 projects.