Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Work Background
Project Manager Technical Services - Americas
VantiveProject Manager Technical Services - Americas
Feb. 2025Cali, Valle del Cauca, Colombia
Project Manager Technical Services - Americas
Baxter International Inc.Project Manager Technical Services - Americas
Aug. 2024 - Jan. 2025Cali, Valle del Cauca, ColombiaProject Manager Technical Services Kidney Care | Americas
Key Projects Regional Lead – LATAM
Baxter International Inc.Key Projects Regional Lead – LATAM
Jan. 2024 - Jul. 2024Cra 56 No 11A - 83, Santa Anita, Cali, Valle del Cauca, Colombia
Global Technical Services Depot Supervisor (57 direct reports)
Baxter International Inc.Global Technical Services Depot Supervisor (57 direct reports)
Aug. 2018 - Dec. 2023Bogotá D.C. - Cali Area, ColombiaContributed to finance leadership in Cluster Colombia, shaping AOP 2018-2024, with a 34% pretax improvement in 2022 vs 2018. Facilitated VIPs 2017-2023, surpassing expectations by 276%, saving USD3M. Guided strategic projects, notably the relocation and setup of a new service center in Cali. Recognized with the Challenge Every Obstacle Award from Baxter Healthcare's CEO Joe Almeida, impacting sales positively by USD500K. Led VIP Projects 2018-2019, achieving a 336% savings of USD 808K, with Lean Six Sigma Green Belt certification for a productivity optimization project. In operations, as Depot Supervisor with 57 direct reports, achieved a 100% rating in the Best Place to Work survey, fostered diversity with a 43% female team, and maintained a philosophy of inclusion and collaboration. Ensured successful internal and external audits, responded to quality claims within 45 days at 99%, achieved 100% on-time FAs, and served as a Local Champion for EVOIQ FA with a budget of USD 8M. Acknowledge the team's collective effort, recognizing a production contribution of approximately USD 19K per hour to the company.
Global Technical Services Depot Supervisor (+65 reportes directos)
Baxter International Inc.Global Technical Services Depot Supervisor (+65 reportes directos)
Aug. 2018 - Dec. 2023Bogotá D.C. - Cali Area, ColombiaFINANZAS (Actuando como líder y responsable de finanzas del ST de Cluster Colombia) ٠Participación y liderazgo en definición de AOP 2018-2024 ٠Mejora en pretax en un 34% año 2022 vs año 2018 ٠VIPs 2017-2023 por USD3M, USD2M por encima de lo esperado (276%) y 584K adicionales de costos evitados. PROYECTOS (Actuando como líder de proyectos estratégicos) ٠Liderazgo proyecto traslado y creación de nuevo centro de servicio y excelencia en la ciudad de Cali, dirigido a soportar la operación de equipos biomedicos que necesitan pacientes y clientes de toda la región. ٠Premio Challenge Every Obstacle otorgado por liderazgo del proyecto Hubble dado por Joe Almeida C.E.O de Baxter healthcare International. (Impacto positivo en incremento de ventas por USD500K) ٠Liderazgo de programa de Proyectos VIP 2018-2019 por USD 1,1M con ahorros favorables USD 808K al plan (336%) ٠Certificación Lean Six Sigma Green Belt por proyecto de optimización de productividad (Beneficio USD 410K) ٠Certificación Lean Six Sigma Yellow Belt por proyecto de optimización de bodega (Beneficio USD 2.5K) ٠Service Level Readiness Asessment (SLRA) para el lanzamiento de HomeChoice Claria en Bolivia, El Salvador, Guatemala, Bahamas, Guyana, Islas Caiman, Jamaica y Uruguay (Servicio desde Colombia), bomba EVOIQ, monitor Starling en Colombia. OPERACION (Actuando como Supervisor del Depot - 67 Reportes Directos) ٠Mejora en encuesta de Mejor Lugar para Trabajar en Management effectiveness en 36ppts llegando al 100% en 2022. ٠Equipo creado con un 43% de mujeres, diverso de todo el país, con la filosofía de inclusión, diversidad y colaboración. ٠Resultados de Auditorias Internas, corporativas y Externas sin hayazgos críticos, considerada la operación como bajo riesgo. ٠Cumplimiento de respuestas de reclamos en menos de 45 dias de calidad al 99% ٠FA realizadas a tiempo al 100%. Local Champion para EVOIQ FA (presupuesto de USD 8M) ٠Producción que genera aproximadamente a la compañía USD 19K por hora.
TS Operation Analyst Cluster Colombia
Baxter International Inc.TS Operation Analyst Cluster Colombia
Feb. 2016 - Aug. 2018Complejo Logítico San Cayetano Carrera 85D 46A-65, Bogotá D.C. Area, Colombia2016 ACHIEVEMENTS ٠ SLRA for launch new technology HomeChoice Claria in Colombia, Chile, Ecuador and Dominic Republic. ٠ End of year 2016 with 100% of completed trainings in all cluster Colombia. 2017 ACHIEVEMENTS ACTING AS TS OPERATION LEADER CLUSTER COLOMBIA ٠ 2017 VIP Projects exceeded in 51% annual savings target. ٠ Kick-off assets management project at customer site with the goal to improve the productivity (Hubble Project) ٠ Deployment of EMS at field and customers (LSW, Visual management, Daily accountability) ٠ Kick-off of FSE new KPI in Colombia to monitor and improve the productivity. ٠ Member of Colombian AOP 2018 definition team.
Analista de Operaciones de Servicio Técnico Clúster Colombia
Baxter International Inc.Analista de Operaciones de Servicio Técnico Clúster Colombia
Feb. 2016 - Aug. 2018Complejo Logítico San Cayetano Carrera 85D 46A-65, Bogotá D.C. Area, ColombiaLOGROS 2016 ٠ SLRA para el lanzamiento de HomeChoice Claria en Colombia, Chile, Ecuador y República Dominicana. ٠ Cierre del año 2016 con un 100% de entrenamientos completados en todo el clúster. LOGROS 2017 ACTUANDO COMO LÍDER DE OPERACIONES ST CLÚSTER COLOMBIA ٠ Proyectos VIP 2017 superaron en un 51% el objetivo de ahorros del año. ٠ Lanzamiento de proyecto de manejo de activos en cliente para mejora de productividad. (Proyecto Hubble) ٠ Despliegue de EMS en campo y clientes (LSW, “visual management”, daily accountability”) ٠ Lanzamiento de KPI para FSE en Colombia con el objetivo de mejorar el rendimiento y cumplimiento de objetivos. ٠ Participación en definición de AOP 2018 Colombia.
Quality Project Manager
Harbin Hafei Airbus Composite Manufacturing Co., Ltd.Quality Project Manager
Aug. 2012 - Jan. 2015No.57 Songhua Road, Core Zone, Harbin New South Industrial City, Harbin (China)HELP TO SUSTAIN QUALITY MANAGEMENT SYSTEM (QMS) IN THE ROLE OF A Q SYSTEM ENGINEER ٠ Manage Procedural Documentation following (ISO 9001 & AS9100-C) requirements (Create, revise, cancel and publish documents. E-office Archive system setup) ٠ Management Review Meeting preparation and follow up ٠ Process Effectiveness Assessment Reports (PEAR) ٠ Quality Risk Focal Point ٠ Member of Corrective Action Board ٠ Internal Auditor (Product Audits Responsible) ACHIEVEMENTS ٠ Key Performance Indicators (KPIs) projects setup ‐ Business KPIs (Monthly Report) & HMC Dashboard (Finance & Business Status Report) ‐ General Requirements for Aero-structure & Material Suppliers (GRAMS) KPIs ‐ Quality KPIs Responsible (Audits, FAI, Risk, NCs, CNQ and Incoming Inspections) ٠ Station Assessments rollout project (6M + 5S Flash Audits of the entire shop floor in MC) in cooperation with LEAN team ٠ FOD prevention project. CNQ Project ٠ Statistical Process Control project: Process Editable (PE), Key Characteristics (KC) and Control Plan Templates (for Inspectors input, Quality Engineers Analysis and Manufacturing Engineers Control) ٠ Creation of Curing Cycles Data Analysis Template
Quality Project Manager (China)
AirbusQuality Project Manager (China)
Aug. 2012 - Jan. 2015No.57 Songhua Road, Core Zone, Harbin New South Industrial City, Harbin (China)AYUDAR A MANTENER EL SISTEMA DE GESTIÓN DE CALIDAD (QMS) EN EL PAPEL DE INGENIERO DE SISTEMAS DE CALIDAD ٠ Administrar documentación de procedimientos siguiendo los requisitos de las normas (ISO 9001 & AS9100-C) (Crear, revisar, cancelar and publicar documentos. Configurar el sistema de archivar en la oficina virtual) ٠ Preparación y seguimiento de la reunión semestral de gestión de la empresa ٠ Informes de evaluación de la eficacia de los procesos (PEAR) ٠ Responsable de los Riesgos de Calidad ٠ Miembro de la junta de acciones correctivas ٠ Auditor Interno (Responsable de Auditorias del Producto) LOGROS ٠ Proyecto de creación de Indicadores de rendimiento (KPIs) de la empresa ‐ Indicadores de Negocios (Informe mensual) & Cuadro de mando integral de la empresa (Informe del estado de Finanzas & Negocios de la empresa) ‐ Indicadores de los requisitos generales para aero-estructuras y proveedores de materiales (GRAMS) ‐ Responsable de los indicadores de Calidad (Auditorias, FAI, Riesgos, NCs, CNQ e inspecciones de materias primas) ٠ Proyecto de evaluaciones de estaciones de trabajo periódicas (6M + 5S): Auditorias rápidas de toda la planta de producción, con cooperación de los equipos de LEAN, HSE, IT y de mantenimiento. ٠ Proyecto para la prevención de Objetos extraños (FOD). ٠ Proyecto de automatización y reducción de tiempos del análisis de CNQ ٠ Proyecto para el control estadístico de los procesos (SPC): Procesos editables (PE), Características clave (KC) plantillas de plan de control (toma de datos por los Inspectores, análisis de los ingenieros de calidad y control de los ingenieros de fabricación) Proyecto para la creación de plantilla de análisis de datos de los ciclos de curado
Continuous Improvement and Integration (Spain)
AirbusContinuous Improvement and Integration (Spain)
Mar. 2011 - Mar. 2012PASEO JOHN LENNON, 2 - 2 D, 28906, Getafe (Madrid)٠ Automate Monthly Quality Report and publication ٠ Collaborate in the creation of new Quality Key Performance Indicators. Operating Level Document updated in the elaboration of Monthly Quality Report. ٠ Collaborate in the deployment of Cost of Non Quality Project in all plants, programs and functions (Engineering & Supply Chain) in Quality Direction. ٠ Act as interlocutor with Central Quality (Toulouse, France) in Airbus for the reporting of Non Conformities and Concessions in the different programs as planning. ٠ Create digital SQCDP (Security, Quality, Customer, Delivery & People) to monitor and take actions in Quality Direction. ٠ Collaborate in audits such as identification and marking of components, Measure Means Calibrations, etc. ٠ Monitoring of Green Belt and Black Belt projects. ٠ Contribution in continuous improvement deployment at Airbus in an international level. ٠ Participation in “Kaizen” (Lean deployment) of quality.
Continuous Improvement and Integration (España)
AirbusContinuous Improvement and Integration (España)
Mar. 2011 - Mar. 2012PASEO JOHN LENNON, 2 - 2 D, 28906, Getafe (Madrid)Automatizar, preparar y publicar el informe Mensual de Calidad. Actualizar y publicar el manual de elaboración del informe Mensual de Calidad. ٠ Colaborar en la creación de nuevos indicadores de rendimiento (KPIs). ٠ Colaborar en el despliegue del proyecto de Costes de No Calidad en todas las plantas, programas y funciones (Ingeniería y logística) siguiendo los requisitos del Director de Calidad. ٠ Comunicación directa con la central de Calidad (Toulouse, France) en Airbus, reportando las No Conformidades y Concesiones de los diferentes programas. ٠ Crear panel digital SQCDP (Seguridad, Calidad, Cliente/Costes, Entregas & Trabajadores) para monitorizar y tomar decisiones/acciones en la dirección de Calidad. ٠ Colaborar en auditorias: como la identificación y marcado de los componentes, calibración de los medios de medición, etc. ٠ Monitorizar proyectos “Green Belt” and “Black Belt”. ٠ Contribuir en el despliegue de mejoras continuas en Airbus a nivel internacional. ٠ Participar en “Kaizen” (despliegue de proyectos Lean) de calidad.
Scholarship on Quality Management System.
SOLAICO - Unión Composites S.L.Scholarship on Quality Management System.
Feb. 2008 - Jul. 20087, C/ Vall de Albaida – Cocentaina, SpainCreation of quality control system documentation (ISO 9001). Quality control system implementation process.
Becario en Sistema de Calidad
Solaico, paneles solares fotovoltaicosBecario en Sistema de Calidad
Feb. 2008 - Jul. 20087, C/ Vall de Albaida – Cocentaina, EspañaCreación de la documentación del sistema de control de calidad (ISO 9001) Implementación del proceso del sistema de control de calidad
Pizza delivery.
ROCA FEDA, S. L. (TELEPIZZA)Pizza delivery.
Oct. 2007 - Mar. 20111, C/ Gongora – Alcoy, Spain.Door to door delivery. Prepare various types of pizza as per the customer request. Cook other fast food items.
Repartidor de Pizza.
ROCA FEDA, S. L. (TELEPIZZA)Repartidor de Pizza.
Oct. 2007 - Mar. 20111, C/ Gongora – Alcoy, Spain.Entregar el pedido a la puerta del cliente. Preparar varios tipos de pizza bajo el pedido del cliente. Cocinar distintos tipos de comida rápida.
IT Support (Internship through competitive examination)
Data Processing Centre, ALCOY COUNCILIT Support (Internship through competitive examination)
Feb. 2007 - Feb. 20081, Pl. España – Alcoy, Spain.Computer Maintenance. Network Administration. Installation and maintenance of Computer Rooms. Attention to public.
Soporte IT en CPD (Centro de Proceso de Datos)
ayuntamiento de alcoySoporte IT en CPD (Centro de Proceso de Datos)
Feb. 2007 - Feb. 20081, Pl. España – Alcoy, España.Mantenimiento de Ordenadores Administración de Redes Instalación y mantenimiento de Aulas de Informática Atención al Público.

Requests

Touchpoint image
0
Personal Pitch
Pharma, Engineering Project Management Solutions
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Nicolas on Intch
Engineer
502159 people
19
Corporate sustainability advisor and facilitator of human and corporate cultural transformation experiences
18
CFO @ Carvajal
38
Business Development @ Servinformación
EngineerAerospace engineer
11385 people
16
Systems Developer @ iniBuilds
15
Aeronautical Engineer / Mechanic @ Avianca
24
VP of Sale LATAM @ Eutelsat OneWeb