TeslaSenior Equipment Engineer - GigaFactory Texas
Apr. 2021 - Jun. 2022Austin, Texas, United StatesLead design engineering and permit/stamp approval of a $70mil high volume PTED paint system for Model Y and Cybertruck in an ultra-fast paced, high intensity environment.
- Lead 3 engineers to develop fabrication and installation drawings and specifications.
- Managed vendors/suppliers to deliver large steel weldments on very short lead times.
- Directed onsite installation of structures, tanks, walkways, mezzanines and processing equipment.
- Navigated complex design and structural engineering analysis with S.E./P.E. contractor engineers.