logo
Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Work Background
Turbine Maintenance Manager
SAETurbine Maintenance Manager
Dec. 2021Scotland, United Kingdom-Coordinate and manage the maintenance of a first of class turbine -Asset management turbine spares and equipment -Part of offshore/marine team in deployment and retrieval of turbines -Data analysis of tidal array for day to day monitoring and improvement opportunities
Base Operations
HalliburtonBase Operations
Nov. 2020 - May. 2021Malaysia· Carry out planned maintenance, breakdown repairs, refurbishment, installation, improvements and modifications to Halliburton equipment and tools which include HCS Advantage cementing unit, Continuous Metering System (CMS), Commander Heads, Cement Heads and various downhole tools to the required standard. · Meet customer needs and equipment operating and safety requirements with a ‘right first time’ approach along with maintaining a safe workshop environment at an improved ongoing cost. · Coordinate and manage equipment and material utilized in offshore operations from Halliburton’s Kemaman base. · Manage the movement of equipment, tools, chemicals and cement between offshore rigs, base and suppliers. · Ensure material supply per customer project based on required dates while optimizing inventory levels. · Knowledgeable in the use of SAP ERP system for management of material and equipment.
Field Operations Professional
HalliburtonField Operations Professional
Mar. 2019 - Dec. 2020Kuala Lumpur, Malaysia· Assist Service Supervisor in well cementing and other related pressure testing activities on offshore rigs. · Operate and perform maintenance of Halliburton HCS Advantage cementing unit and Continuous Metering System (CMS). · Assist in pre- and post-job activity – offline and online jobs including review job documentation, onsite job calculations and monitor progress of cement job. · Manage and maintain material/equipment/chemical/cement inventory on rig for ongoing operation and contingency plan. · Finalizing the cementing field calculation with customer representative onboard · Laboratory work - cementing laboratory tests which include handling viscometer, Ultrasonic Cement Analyzer (UCA) and consistometer (for thickening time).
Graduate Research Assistant
Center for Seismic Imaging & Hydrocarbon PredictionGraduate Research Assistant
Aug. 2016 - Jan. 2019Perak, MalaysiaThe Center for Seismic Imaging (CSI) is a research center in Universiti Teknologi PETRONAS dedicated to geophysical development and improved hydrocarbon prediction. As a graduate research assistant, I am tasked with developing a new and efficient workflow in reservoir modeling based on actual field data provided by PETRONAS. As part of a team, I aim to improve the way the industry builds a static model for better field development. · Project(s): o Integrated static and dynamic reservoir modeling o Co-author of a geophysical textbook “Seismic Imaging Methods and Application for Oil and Gas”. o Performed seismic elastic inversion for a field offshore of Turkmenistan for PETRONAS Carigali.
Intern
Petronas Carigali Sdn. Bhd.Intern
Jun. 2015 - Sep. 2015Kuala Lumpur, MalaysiaPETRONAS Carigali Sdn. Bhd. undertakes oil and gas exploration and production. I was assigned to the Geoscience Department as an intern where I learnt the ins and outs of building a static model. · Reported to: Staff Geologist & Manager of Petroleum Geoscience Department · Project(s): o Implementation of streamline simulation in ranking equiprobable reservoir models. I built a static model for a section of a field in the Malay basin and simulated the flow of injected water via streamlines. This was to improve the conventional method of ranking equiprobable models.
Intern
Center for Seismic Imaging & Hydrocarbon PredictionIntern
Jan. 2015 - Sep. 2015Perak, MalaysiaComing from an engineering background, I first delved into the geosciences during my internship with the Center for Seismic Imaging (CSI). During my internship here, I attended classes and seminars on geophysics and geology. I learnt hands-on skills such as seismic interpretation and reservoir modeling using the Petrel software. · Reported to: Head of CSI · Project(s): - Produced a Student Industrial Training report with a focus on reservoir modeling. - Integrated static modelling an dynamic simulation, Petrel and Eclipse user, seimic interpretation, reservoir engineering. Worked on Malay Basin and Luconia Basin.
Journalist
SPE-UTP Student ChapterJournalist
Jan. 2014 - Dec. 2014Perak, Malaysia
Chief Reporter
Heart of TronohChief Reporter
Jan. 2012 - Dec. 2013Perak, Malaysia

Requests

Touchpoint image
17
Looking for a Job
Project Manager - Job Search Request
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Teresa on Intch
Startup Founder
97533 people
316
Founder
18
Ceo @ Lumenlinks Ltd
23
Automation Engineer @ Cognizant Technology and Solutions
Startup FounderProduct Consultant
21525 people
24
CPO @ YouHodler
15
Founder and Managing Director @ Future Analytics
16
Investments Advisor @ ESSO