Huawei Technologies Co. NGMTN 3G turnkey-Project (Team Lead -RF Engineer)
Jun. 2014 - Apr. 2015Lagos, Nigeria.•RF planning for Macro UMTS. •CDD, EPT preparation for RAN/BSS. •Coordinate DT teams, analyze the log files and make proposal for optimization •Interface with customer, attending to customer complains. •UMTS Network Optimization. •Resolution of interference, data throughput, coverage and transmission path performance issues. •Tilt, Neighbour and CPICH power recommendations based on site propagation as appropriate. •Radio Network planning including nominal and final. •Parameter Optimization to improve congestion (CE congestion, Iub Congestion, UL/DL power Congestion, Code Congestion) and Traffic Load balancing •Radio Network Single Site Verification, drive test and analysis. •RET configuration, Resolving Sector Swap Issues. •Log File Analysis Using Tems Discovery/Map Info tool. •KPI monitoring using iManager M2000/CME, Surizon Facts, FMA. •Optimization of 3G: CE Congestion, Power Congestion, Iub congestion, FACH congestion, Code congestion.