JV SKM-LavalinMarine Works Technical Superintendent
May. 2013 - Aug. 2014ColombiaLed marine works delivery for the P40 berth, including Core-Loc® armour unit installation for coastal protection and shiploader installation support over radial pile caps. Managed placement tolerances, lifting/handling methods, and QA/QC traceability for Core-Loc units (set-out, seating, interlocking checks, as-built records) to ensure stability and acceptance. Coordinated shiploader interface alignment, field surveys, and as-built verification to minimize rework, control risk at critical interfaces, and protect schedule.