The HEINEKEN CompanyPlant Maintenance Manager (Energy & Water Champion)
May. 2017 - May. 2023KDOversee high-performing preventive maintenance team, operation staff, and labor services accountable for mechanical, electrical, and electronics diagnostics, repairs, fabrication, and construction, generating and distributing water, effluent water treatment, glycol, steam, condensate, air, CO2, cooling, installation of machines and equipment, and assets management, while driving optimal performance and minimizing downtime,
• Established structure predictive and preventive maintenance strategies in managing the equipment reliability and the operations of Boilers, Burners, Air Compressors, Ammonia Compressors, CO2 Compressors, CO2 Liquefaction Compressors, Vaporizers, Evaporative Condensers, Chillers, Pumps, Plate Heat Exchangers, Water Treatment Plant, Waste Effluent Treatment Plant, Cooling Towers, Hydraulic/Pneumatic tools, and utility materials handling. • Responsible for the preventive maintenance and operations of the Water treatment plant (Service Water, Process Water, and Carbonated Water) and Wastewater treatment plant (Sedimentation, Screen Press. Oil Skimmer, Calamity Tank, Equalization Tank, UASB – Up-flow Anaerobic Sludge Blanket, (Biogas Generations) SBR – Sludge Back Reaction, and Chlorination Pit).
• Coordinated the preventive maintenance of Brewing process equipment, (Silo Equipment, Intake Pit Radler Conveyor, Grain Silos, Pneumatic Valves, Bucket Elevators, Cyclone dust, Key Achievements. • Implemented cost-saving initiatives in managing utility machines and equipment by optimizing overall running 15% uptime, quality, and safety.
• Spearheaded an energy efficiency improvement and overhaul that cut utility costs by 15%, streamlining budget adherence to business objectives.
• Optimization of brewing equipment's overall running time from 95% utilization to 85% usage reduction to save energy consumption.
• Developed a cross-training program that increased maintenance and operational team efficiency resulting in a 10% reduction in labor costs.