ThredUpDirector of Industrial Engineering
Apr. 2024United States• Navigated complex stakeholder relationships to align projects with business objectives, securing an annual CAPEX budget increase from $4.5M to $6M within two years. • Led cross-functional engineering teams to design and integrate Automated Mannequin Studios (AMS), driving $3.6M in yearly savings and doubling operational capacity in core processing markets. • Streamlined AMS implementation, reducing deployment and testing time by 66%, and optimizing operational efficiency. • Implemented an in-house ergonomic hanger back pressure release system, reducing injury recordable by 90% in targeted processes. • Spearheaded a chute transition project, boosting regional package sorting capabilities by 214%, saving 4% in logistics costs, and decreasing buyer wait times. • Designed and implemented a redesigned Quality and Tags (QT) station, increasing process capacity by 12% and enhancing ergonomics. • Introduced automatic mannequin detection technology, cutting garment handling and processing time by 15% and eliminating manual garment measurement. • Developed a broken wheel detection system for early wear detection, optimizing preventative maintenance scheduling and reducing system downtime. • Managed over $20M in capital projects, including GOH carousel automation during COVID-19, with zero delays in deployment. • Led the successful ramp-up of two facilities, transitioning from manual operations to automation, significantly enhancing productivity.