Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Work Background
Project Estimating and Controlling Lead
Medco E&P IndonesiaProject Estimating and Controlling Lead
Mar. 2025Jakarta, IndonesiaEmployment Status: Third Party Contract Project: • Forel New Oil Field Development, Offshore Natuna ( FPSO, WHPs, Subsea Pipelines)
Senior Cost Estimator
WoodSenior Cost Estimator
Nov. 2023Doha, QatarEmployment Status: Permanent Hired<br><br>• Prepare Estimate Development Plan.<br>• Prepare Estimate Basis Memorandum.<br>• Build estimating templates.<br>• Prepare CAPEX (Brownfield) and ABEX estimates (Decommissioning)<br>• Perform probabilistic risk analysis for final cost estimate.<br>• Undertake estimate benchmarking for final cost estimate.<br>Projects:<br>• FEED for MM Re-Development and PS-3 Life Extension (QatarEnergy, 2022-2024)<br>• FEED for Decommissioning of Obsolete Facilities at Halul (QatarEnergy, 2022-2024)
Lead Estimator
WoodLead Estimator
Nov. 2023 - Mar. 2025Doha, QatarEmployment Status: Permanent Hired Projects: • FEED for MM Re-Development and PS-3 Life Extension (QatarEnergy, 2022-2024) Roles: - Lead TIC estimate for PS3 Bul Hanine (BH) EPIC-3 Brownfield - Support UK Office for BH EPIC-1 Greenfield TIC Estimate preparation - As Lead Estimator to prepare BH EPIC-1 T&I Estimate - Lead TIC Estimate for PS2 Maydan Mahzam (MM) EPIC-1 Greenfield - Lead TIC Estimate for MM EPIC-3 Brownfield Final Estimates package completed and approved by QatarEnergy in November 2024. • FEED for Decommissioning of Obsolete Facilities at Halul (QatarEnergy, Q3-2023 to Q1-2024) Role: Lead TIC Estimate. • Class-3 Estimate LNG Jetty Masra Project Oman Field (TotalEnergies, Dec-24 to Jan-25) Role: Prepare benchmarking using Wood Qatar database against TIC prepared by Wood Galway Office-Ireland. • Class-4 Estimate: Matola (Mozambique) LNG FEED Design Update (Total Gas & Power Business Services, Jan-Mar 2025) Role: Supporting Wood Galway Office to lead preparation Class-4 estimate Matola LNG FEED from Jetty to Jettyless concept.
Project Control Lead
PT Medco Energi Internasional TbkProject Control Lead
Dec. 2021 - Nov. 2023Jakarta, IndonesiaEmployment Status: Third Party Contract. Lead Paus Biru Project Control Team and support Project Manager to deliver Paus Biru Development to be on-stream in Q1-2025. Other Assignment: As Cost Engineer/Estimator and Project Control for Forel-Bronang Oil Field Development and Bronang Gas Development.
Project Cost Controller Manager
South Pacific Viscose, PT. a Lenzing Group companyProject Cost Controller Manager
Sep. 2021 - Nov. 2021Purwakarta, West Java, IndonesiaEmployment Status: Permanent Hired. Responsible to manage and control Project Capex above US$150mn with main scope to build new facility for reduction of sulfur and waste water emissions, CO2 reduction, improvements in quality and modification of existing production facility. The project execution started in Q1-2021 and plan for on-stream in Q1-2023 and will enable the Purwakarta Plant Site for manufacturing of specialties product (fiber) as of April 2023.
Cost Engineer/ Estimator (Budgeting/ Estimation/ Project Control)
PT Medco Energi Internasional TbkCost Engineer/ Estimator (Budgeting/ Estimation/ Project Control)
May. 2019 - Aug. 2021Greater Jakarta Area, IndonesiaOphir Energy plc was acquitted by PT Medco Energi Internasional Tbk in May 2019 with value US$517.23 million. Hired under Third Party Contract and continuing previous tasks as previously assigned in Ophir prior to acquitted by Medco. Additional Projects and Tasks: - Paus Gas Field Development, Located in Madura Strait, East Java, Indonesia. Paus Biru Project is development of new gas field in the Sampang PSC with the main scope to build and install 1 (one) unit WHP and 27 KM Subsea Pipeline, modification existing Oyong WHP and Grati Onshore Processing Facilities and 1 (one) development well. Contributed as Cost Engineer/Estimator/Project Control from initial phase, Conceptual Study and PreFEED, FEED up to Detailed Engineering. Achievement: - Forel-Bronang Development This is a green-field project to develop new oil and gas field in the Natuna Block with the main scope to build and install 2 (two) units WHP, 17 KM Subsea Pipeline, and 1 (one) unit Floating Production Storage & Offloading (FPSO), and 5 (five) development wells. Contributed as Cost Estimator and Project Control from FEED phase up to EPCI AFE Approval by SKKMigas.
Cost Engineer/ Estimator (Budgeting/ Estimation/ Project Control)
Ophir-EnergyCost Engineer/ Estimator (Budgeting/ Estimation/ Project Control)
Sep. 2018 - May. 2019Greater Jakarta Area, IndonesiaSantos Ltd Asian Assets was acquitted by Ophir Energy in September 2018. Hired under Third Party Contract and continuing previous tasks as previously assigned in Santos prior to acquitted by Ophir. Additional Project: West Kerendan Facility Development (US$30 million project) from 2018 until 2022 (expected). Located in Central Kalimantan, Indonesia, build Well Pad, 8Km Pipelines, and Modification of existing Production Facilities.
Cost Engineer/ Estimator (Budgeting/ Estimation/ Project Control)
Santos LtdCost Engineer/ Estimator (Budgeting/ Estimation/ Project Control)
Jan. 2014 - Sep. 2018Jakarta, IndonesiaEmployment Status: Third Party Contract (Daily Rate Basis) Main tasks: - Cost estimating from screening, conceptual, Pre-FEED, FEED and execution (update capex based on actual cost) - Support for Plan of Development Preparation (Green and Brown Field) - Support for Final Investment Decision (FID) - Prepare JV-Corporate and SKK Migas (Government Body) Authorization for Expenditures (AFE) - Prepare annual Work Program and Budget (WP&B) - Prepare quarterly capex forecast - Prepare monthly report (JV-Corporate and SKK Migas) - Prepare AFE Closed-Out - Define the WBS and structure for cost estimates. - Generate EPCI owner estimate for tender purpose. Projects: - Ande Ande Lumut Oil Field Development (US$1.5 billion). from 2011 until 2017. Located at Natuna Sea, build Wellhead Platform, FPSO, and about 30 development wells. - Modification of Onshore Processing Facilities (US$7 million) from 2017 until 2018. Replacement of Gas Compressor at Santos Onshore Facility in Gresik, East Java. - Meliwis Gas Field Development (US$100 million) from 2017 until 2019. Located at Madura Strait, build Wellhead Platform, Subsea Pipeline 11km, modification of existing platform and production facilities.
Senior Cost Engineer
AWE (Northwest Natuna) Pte. Ltd.Senior Cost Engineer
Jun. 2012 - Dec. 2013greater jakarta area, indonesiaEmployment Status: Permanent Hired. Main Tasks: - Prepare Company Cost Management Procedure - Design Cost Breakdown Structure in relationship to Work Breakdown Structure and design the standard code of account - Prepare Capital Expenditures (Capex) Development for Ande Ande Lumut Project - Prepare SKK Migas AFE - Prepare Work Program & Budget (WP&B) - Prepare Monthly Cost Report Project: - Ande Ande Lumut Field Development under Northwest Natuna PSC. Plan of Development approved by Government of Indonesia in October 2011. Departure from AWE: In August 2013 Santos Ltd announced acquisition of 50% participating interest of Northwest Natuna PSC and its Operatorship. November 2013 Santos officially taken over operatorship of Northwest Natuna PSC and in December 2013 I was seconded at Santos Indonesia and officially joined Santos in January 2014.
Senior Cost & Control Engineer
PT. Tripatra Engineers and ConstructorsSenior Cost & Control Engineer
Mar. 2011 - Mar. 2012Greater Jakarta Area, IndonesiaEmployment Status: Direct Hired (Contract). Main Tasks: - Control and monitor project budget utilization and make sure actual cost ratios are not exceeding the KPI ratios - Prepare quarterly forecast of Revenue and Project Costs - Prepare Manpower and man-hours Plan and monitor the work load of the project personnel - Review Cost Estimation of each work order prior to submission to client - Review and monitor the schedule and progress of each on going work order - Produce weekly and monthly progress report (budget, earn, and actual) including engineering S-Curve and deliverable status - Prepare and submit monthly ProForma Invoice based on deliverable progress and time sheet to Client - Produce monthly internal report to Management i.e. cost report, Project Financial Status (Revenue VS Invoice VS Payment), Report of Backlog Revenue and Invoice, and Monthly Flash Report Projects: - Premier Oil Natuna Sea B.V. - Technical Services Support Contract (TSSC). A three years project with contract value of US$21 million (2011-2014) - Class 3 Cost Estimation Development for Bangka Topside FEED - Chevron Indonesia Company (2011-2012).
Senior Budget and Cost Controller
PT. McDermott IndonesiaSenior Budget and Cost Controller
Mar. 2009 - Mar. 2011Batam, Riau IslandEmployment Status: Permanent Hired. Main Tasks: - Produce Operations Department Quarterly and Annual Budget - Manage, controlled, and monitored the utilization of yard operations budget of over US$34 million per year which allocated to 24 cost centers - Control and monitored the consistency of Job Number (Account Code) being used either for man hours or material charging - Produce weekly and monthly variances analysis report of committed operations material cost against the budget and present to Fabrication Facility Management - Produce weekly and monthly variance analysis report on the ratio of fabrication manpower and man hours, Actual Cost VS Standard Cost VS Forecast - Conduct weekly budget & cost review with all department heads under Yard Operations - Attend - Prepare monthly report on the SOx Compliance related to Yard Operations - Check and provide recommendations of all material and service requisition prior to submission to procurement for PO processing - Check all payment prior to Operations Manager approval and make sure that there is no outstanding obligations from the vendor to provide the material or service Projects: - Exxon Mobil (Esso) Australia - Kipper Tuna & Turrum - fab. of Marlin B Topsides and 8 Leg Jacket (13,000 MT) - Chevron Thailand - Platong Gas II - fab. of CPP Topsides & Jacket, Living Quarter Platform, Flare Tripod, and Three Bridges (19,000MT) - Maersk Brazil - Peregrino FPSO Topsides - fab. of FPSO Topside Modules (6500MT) - Woodside - North Rankin B Jacket - fab. of Sub-Structures (22,000MT) - Kellog Joint Venture-Gorgon Chevron Australia – fab. 60 modules of pre-assembled racks and units (25,000 tonnes).
Technical Officer
The ASEAN SecretariatTechnical Officer
Jan. 2007 - Feb. 2009Jakarta-Singapore-Kuala Lumpur-Bangkok-Manila-Hanoi-Phnom Penh-Vientiane-BeijingEmployment Status: Direct Hired (Contract). Achievements: - Generated guideline on budget development and financial reporting including the budget template to the medical and finance officer of 10 (ten) ASEAN Member States; - Successfully organized 22 (twenty two) workshops and meetings from February 2007 to February 2008 in Jakarta, Bangkok, Vientiane, Kuala Lumpur, Beijing, Bali, Metro Manila, Halong Bay, Hanoi, Phnom Penh, and Malacca.
Section Head of Finance and Accounting Department
PT. Batuhitam IndonesiaSection Head of Finance and Accounting Department
May. 2005 - Jan. 2007JakartaEmployment Status: Permanent Hired. Achievements: - Built the financial, accounting, and inventory system together with installing and implementing the Accurate Accounting Software to replace the previous recording
Accountant
PT. IKS Knife and Saw IndonesiaAccountant
Jan. 2002 - May. 2005JakartaEmployment Status: Permanent Hired. Achievements: - Designed the Account Receivable System in Microsoft Excel Spreadsheet which helps the management to analyze the aging of the receivable.
Medco E&P Indonesia
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Tommy on Intch
Finance
738438 people
17
General and Project Manager @ PT. Jaya Makmur Indonesia
18
Accounting Officer @ Toscano Indah Pratama
17
Founder, business owner @ PT ISORES Sinergi Internasional
FinanceFinancial Analyst
185764 people
17
General and Project Manager @ PT. Jaya Makmur Indonesia
17
Founder, business owner @ PT ISORES Sinergi Internasional
20
CEO & Founder @ inspirasindo