Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Work Background
Managing Director
Cozym LimitedManaging Director
Jan. 2017Lekki Phase 1, Lagos, Nigeria
Deputy Engineering Manager
ILF Consulting EngineersDeputy Engineering Manager
Feb. 2015 - Dec. 2016Lagos, Nigeria
Head of Mechanical Engineering
ILF Consulting EngineersHead of Mechanical Engineering
Jun. 2012 - Dec. 2016Nigeria
Lead Mechanical Engineer
ILF Consulting EngineersLead Mechanical Engineer
Jun. 2012 - Feb. 2015Lagos, NigeriaResponsible for specific engineering works for ILF Engineers Nigeria Projects. Coordinate engineering works of ILF Engineers Nigeria engineers for ILF Engineers Nigeria projects. Set-up the engineering team related to Mechanical engineering Early recognition of project plan deviations and the introduction of corrective actions. Ensure fulfillment of the Contract Scope of work related to Mechanical engineering. Perform Pre-feasibility Studies and technical bids. Co-ordinate and interface between the different groups/disciplines involved. Plan and ensure the documentation of design reviews and interdisciplinary checks related to his tasks and give input
Head of Engineering
EPIC Atlantic LimitedHead of Engineering
Nov. 2011 - Jun. 2012FEED and Detail Design of 2 x 10,000 BOPD trains of Oil Production facility as well as associated utility and fire fighting systems. Responsible for spearheading the engineering design of oil and gas facilities and equipments towards generation of documents as necessary to complete the Detail Engineering work and Issued for Construction (IFC) package
Chief Operating Officer
PAMAQUE Nigeria LimitedChief Operating Officer
May. 2011 - Nov. 2011
Lead Mechanical/Piping Engineer
OBAX PPS OREDO FIELD ALLIANCELead Mechanical/Piping Engineer
Feb. 2010 - May. 20111. Design and construction of 10,000BOPD Production plant as well as inter alia equipment/vessels installation, pipe fabrication, construction of crude and fire water storage tanks and complete fire fighting system. 2. Detail Design, Construction, Fabrication and Erection of 2 x 20,000 bbl crude oil storage tanks together with its fire fighting system, Bund walls and associated piping systems 3. Design and construction of 20”x11km High Pressure, 8”x11km Low pressure and 2” Gas Pilot aboveground pipelines including fabrication and installation of pipelines, flare tips and steel pipe supports
Mechanical/Piping Engineer
ILF Consulting EngineersMechanical/Piping Engineer
Aug. 2007 - Feb. 2010Nigeria1. Detailed Engineering design of 12 slot gas lift manifold system (ANSI 900), routing of gas lift flow lines with all appurtenances from wellhead slots to gas lift manifolds, pipe modelling of platform process piping using AVEVA PDMS and preparation of specifications, Material take-offs, datasheets, Equipment and specialty equipment lis 2. Redesign of flow lines process and manifold system to accommodate the increased wellhead shut-in tubing pressure. Design of gaslift system for a new triplex wellhead and flow line routing from wellhead to manifold. Extension of existing firewater lines using fiberbond pipes, to cover the new well area including close/open drain systems to cover the new slots area. Prepared specifications, material take-offs, datasheets, equipment and specialty equipment list 3. Feasibility Studies for Single Point Mooring able to discharge marine vessels of 85,000 DWT, 16” Multi-Product Sub-Sea Pipeline (PMS, AGO, DPK), design Flow Rate of 800 m3/hour., onshore facility containing Power Generation, Booster Pumps, Ultrasonic Metering System, Pipeline Leak Detection System, Firewater System, Control Room, Cathodic Protection System for Pipeline, SCADA, Telecommunication, and Automation. 4. Redesign of platform process flowlines and manifold system to accommodate increased wellhead SITP. Review and validation of detailed Mechanical/Piping Engineering design activities previously conducted for client including, but not limited to: Gas lift & gas injections lines, blow down lines, and offshore platforms firewater lines. Piping isometric drawings, MTO’s and preparation of new drawings suitable for fabrication of new and modified piping, welding procedure, NDE and coating requirements were also prepared. 5. Feasibility studies for multi-product pipeline spanning approximately 8km complete with pumps stations, pigging facilities, valve station and instrumentation and controls

Requests

Touchpoint image
2
Looking for a Job
Consultant or Advisory Opportunity
Touchpoint image
0
Startup Pitch
PVC Foam Boards: Innovative Wood Alternatives
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Kazeem on Intch
Engineer
499152 people
17
Director of Business Development @ DSBA Engineering Limited
16
Travelling Service engineer @ Paterson Simon
38
Project engineer, continuous improvement manager, AI automation, process improvement @ Manufacturing company
EngineerMechanical engineer
62293 people
16
Travelling Service engineer @ Paterson Simon
38
Project engineer, continuous improvement manager, AI automation, process improvement @ Manufacturing company
22
Mechanical Engineer @ Dangote Fertiliser Limited