ETEP TunisieProject Director
Feb. 2022 - Jul. 2023TchadOrganization and the Coordination of activities for the Construction of a 100km Transsaharien motor way N'gouri-Bol , with road structure as follows :couche de forme 30cm, sub base course : cement improved silty sand thickness 20cm , Road base course : GRH 0/31.5 thickness 15cm, wearing course Asphalt concrete 0/12 thickness 5cm with reinforcement Geogrids ,road shoulder with single surface dressings chippings 6/12 , construction of a Toll gate as well as a weighing station , stabilization of dunes, are what constitute the project.