Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Work Background
Senior Planning & Project Controls Leader
GE VernovaSenior Planning & Project Controls Leader
Mar. 2023 - Dec. 2025CameroonResponsable de la planification stratégique et du contrôle des délais d’un projet hydroélectrique international majeur. Principales responsabilités : • Pilotage du planning intégré EPC (Ingénierie – Approvisionnement – Construction – Mise en service) • Coordination des interfaces multidisciplinaires (civil, mécanique, turbines, générateurs) • Animation des réunions de planification et suivi des lookahead planning • Analyse forensic des retards et application de la méthode TIA • Préparation des dossiers d’extension de délais (EOT) • Développement de tableaux de bord exécutifs (SPI, CPI, tendances chemin critique) • Mise en œuvre de stratégies de récupération des délais pour limiter les dérives planning Résultat : Contribution directe à la maîtrise des délais, sécurisation des jalons contractuels et amélioration de la prise de décision du management.
Senior Planning Lead – Projets d’arrêts techniques offshore
TotalEnergiesSenior Planning Lead – Projets d’arrêts techniques offshore
Jan. 2022 - Feb. 2023République du CongoPlanification et coordination de plusieurs arrêts techniques offshore majeurs. Projets : • Plateforme ALIMA – 350 M$ • Plateforme NKOSSA – 500 M$ • Plateforme SENDJI – 400 M$ • Terminal DJENO – 250 M$ Responsabilités: • Élaboration et optimisation des plannings d’arrêt intégré multidisciplinaire (mécanique, électrique, instrumentation, inspection) tenant compte des contraintes logistiques et maritimes. • Coordination des sous-traitants internationaux • Analyse des écarts planning et mitigation des retards • Support aux dossiers contractuels EOT Résultat: Arrêts techniques réalisés avec moins de 3 % d’écart sur les délais planifiés.
Projet Manager
Prunus EngineeringProjet Manager
Mar. 2019 - Dec. 2021Douala VProjets majeurs : • Optimisation station de pompage – SCDP (1 M$) • Installation unité de cimentation – Schlumberger (500 K$) Gestion complète de projets industriels incluant : • Gestion des offres techniques et financières • Planification de référence des projets et suivi • Coordination des travaux mécaniques et électrotechniques • Suivi budgétaire et reporting projet • Coordination fournisseurs et sous-traitants Résultat : Livraison des projets dans les délais contractuels avec conformité totale aux exigences HSE.
Planning Manager
PerencoPlanning Manager
May. 2016 - Jan. 2019CamerounProjet : Projet Installation Pipeline Onshore/Offshore – 100 km – Valeur : 600 M$ Responsable de la planification et du suivi d’un projet majeur de pipeline. Responsabilités : • Élaboration du planning de référence sous Primavera P6 • Chargement ressources et coûts • Coordination des équipes pluridisciplinaires (génie civil, pipeline, logistique) et gestion des relations avec PERENCO. • Suivi des indicateurs KPI de performance • Gestion des contraintes environnementales et logistiques Résultat : Pipeline livré dans les délais contractuels avec conformité HSE > 98 %.
Planning Engineer
FOURE LAGADECPlanning Engineer
Feb. 2015 - Mar. 2016Porto GentilProject: Revamping work on the various Oil Rig in On /Off shore PERENCO Gabon launched a large-scale revamping program for several offshore oil platforms to extend their service life, improve operational performance, and ensure compliance with safety and operational standards. The works included the refurbishment of critical equipment, steel structures, piping systems, instrumentation, and electrical systems. Role: - Developed and updated detailed revamping schedules for each platform, in coordination with engineering, logistics, and HSE teams. - Integrated offshore constraints (weather windows, personnel transfers, logistical limitations) into the overall schedule. - Implemented daily progress tracking, variance analysis, and real-time adjustments to optimize work sequences. - Coordinated with site managers, supervisors, and client representatives to maintain visibility on critical milestones. Results: - Projects delivered within contractual deadlines despite offshore constraints. - Improved synchronization between multidisciplinary teams. - Direct contribution to meeting HSE objectives and ensuring efficient restart operations.
Project & Planning Engineer
Orsam EnergiesProject & Planning Engineer
Jun. 2013 - May. 2014New Takoradi Werstern-GhanaProjects Handled • Client: MODEC Oil & Gas Ghana Project: Construction and Installation SRU By-PASS stainless steel piping line of 1Km, 14” of FPSO MV21 Kwame Nkrumah • Client: FMC Technology Ghana Project: Construction and Installation two large Metal Shed • Client: HALLIBURTON Ghana Project: Construction and Installation Metal Shed and various piping network In a high-demand offshore environment, ORSAM Oil & Gas provided industrial maintenance services, logistical support, and technical assistance to several major clients operating on offshore oil facilities in Ghana, notably on the FPSO Kwame Nkrumah (operated by MODEC and Tullow Oil), as well as for Schlumberger during drilling and well intervention operations. Role and key achievements: - Developed intervention and preventive/corrective maintenance schedules for production equipment, lifting systems, piping, and electrical systems on offshore platforms. - Coordinated with field teams and HSE departments to integrate operational constraints (restricted access, simultaneous operations, weather windows). - Regularly updated schedules, tracked progress, analyzed deviations, and proposed corrective actions. - Implemented performance indicators (KPIs) to monitor availability and safety commitments. Results: - Met intervention deadlines in a complex offshore environment. - Contributed to reducing unplanned downtime. - Successfully collaborated with multinational teams (MODEC, Schlumberger, Tullow) in an intercultural context.
Project & Planning Engineer
TotalEnergiesProject & Planning Engineer
Mar. 2012 - May. 2013Porto GentilProject: Anguille redevelopment power plant, Site PG2. The Anguille Redevelopment Power Plant project was part of Total Gabon's strategy to rehabilitate and modernize the Anguille offshore oil field, one of the country’s oldest. The field required a new power generation plant to ensure continuous and secure electricity supply to the surrounding offshore platforms. The goal was to improve energy efficiency, enhance the reliability of the offshore power network, and support the production recovery plan. Role and key achievements: - Developed and monitored the execution schedule of the project, including civil works, installation of generator sets, and connection to offshore networks. - Coordinated with system engineers, HSE teams, and the client to incorporate constraints related to simultaneous operations, safety, and offshore logistics. - Implemented a weekly reporting system covering project milestones, physical progress, and critical resources. - Analyzed schedule variances, updated the planning, and adjusted work sequences to maintain deadlines. Results: - Power plant commissioned in line with the overall project schedule. - Optimized offshore work sequencing despite weather-related constraints. - Contributed to the success of a strategic project for Total Gabon, ensuring stable power supply to multiple offshore units.
Project & Planning Engineer
Ortec GroupProject & Planning Engineer
Oct. 2011 - Feb. 2012Douala VClient: SONARA / Foster Wheeler Project: Shutdown SONARA Refinery 2011. As part of its modernization program, SONARA (Société Nationale de Raffinage) launched a planned shutdown to carry out critical works, including piping tie-ins and the installation of instruments required for the future expansion of the refinery. This shutdown was a strategic phase, as it had to be executed within a very short timeframe while ensuring a high level of safety and coordination among all trades. Role and key achievements: - Developed and monitored the shutdown schedule, covering all phases: draining, degassing, mechanical works, tie-ins, NDT inspections, requalification, and commissioning. - Coordinated with technical teams (piping, instrumentation, electrical) and area supervisors to track daily progress. - Implemented real-time monitoring tools and led coordination meetings to ensure consistency across interventions. - Analyzed potential delays and proposed catch-up and sequencing optimization solutions. Results: - Shutdown completed within the allotted timeframe, despite intense simultaneous operations. - Critical tie-ins and installations delivered safely and in full compliance, enabling the planned expansion project. - Contributed to a zero-incident shutdown, thanks to strong coordination between planning and execution.
Piping & Structural Draftsman, then Planning Support
Chantier Naval et Industrielle du CamerounPiping & Structural Draftsman, then Planning Support
Jun. 2006 - Mar. 2011Douala V, Région du Littoral, CamerounDuring this period, CNIC led several major offshore projects, including: - The construction of the SAIPEM TAD barge (Tender Assisted Drilling), an international project delivered for the Italian company SAIPEM. - The maintenance shutdown of the TRIDENT 14 oil platform, owned by Transocean and operating off the coast of Cameroon. These technically and safety-demanding projects marked an important step in developing local expertise in offshore engineering and industrial maintenance. Role and key achievements: - As a piping and structural draftsman, I contributed to the development of isometric drawings, equipment layout plans, and fabrication details for prefabrication workshops and field teams. - Direct contribution to the technical compliance of fabrications in collaboration with method, quality, and production engineers. - On the TRIDENT 14 project, I worked with maintenance teams to prepare structural and piping interventions, incorporating lessons learned from the field. - Toward the end of the projects, I began exploring planning and progress monitoring tools, which marked the beginning of my transition into project planning—a path I fully embraced afterward. Results: - Successful participation in two flagship projects for CNIC. - Acquired a strong technical foundation in offshore piping and structural works. - Initiated my specialization in industrial planning, which shaped the next steps of my career.

Requests

Touchpoint image
0
Looking for a Job
Senior Planning Manager & Project Control
Touchpoint image
0
Looking for a Job
Senior Planning Engineer & Project Controls Expert
Touchpoint image
0
Personal Pitch
Project Planning Specialist Needed for Quick Win
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Philippe on Intch
Sales & BizDev
746450 people
25
Audieur senior, Chef Comptable
21
Global Project Manager, Certified Financial Modeler & Chief Executive Consultant @ Chu & Partners Business Consulting, Inc.
53
sales executive western and central Africa @ LABORATOIRES ABBOTT
Sales & BizDevBusiness Development Manager
225271 people
21
Global Project Manager, Certified Financial Modeler & Chief Executive Consultant @ Chu & Partners Business Consulting, Inc.
53
sales executive western and central Africa @ LABORATOIRES ABBOTT
15
Director of Operations @ AI27