Cenit Transporte y Logística de HidrocarburosProject Manager - ILI
Aug. 2017 - Feb. 2020Distrito Capital, ColombiaStrategic Capabilities: o Advanced pipeline infrastructure risk management o Comprehensive In-Line Inspection (ILI) project management o High-stakes technical project coordination Key Data Analysis Achievements: • Infrastructure Risk Management: o Managed a $10 million project for Cenit pipeline network analysis o Developed innovative inspection methodologies for precise pipeline condition assessment • Technical Inspection and Diagnostic Innovations: o Introduced advanced methodologies for bending strain and pipeline movement analysis o Developed precise geotechnical threat detection techniques o Created new approaches for ILI inspection planning and execution o Optimized preventive maintenance investment strategies • Contractual and Technical Excellence: o Signed 5 inspection contracts in one year o Achieved $150,000 savings per contract o Ensured rigorous compliance with technical inspection standards o Validated complex technical information from multiple inspection sources Analytical Tools and Methodologies: • Advanced Inspection Technologies: o Geometric + inertial mapping analysis o Thickness loss detection o Circumferential and longitudinal cracking identification o Mechanical anomaly detection (dents, folds, wrinkles, ovalities) • Data Analysis Techniques: o External force impact assessment o Pipeline deformation and movement tracking o Strain analysis o Unitary deformation calculation o Relative pipe movement identification • Risk Management Approaches: o Condition-based maintenance optimization o Geotechnical right-of-way analysis o Comprehensive mechanical diagnosis methodology o Precise threat identification and mitigation planning