Leighton Asia, India and OffshoreSenior Engineer
Dec. 2015 - May. 2023Hong Kong, Hong Konga) Supervise, review and checking the as-built records i.e., test reports, certificates, drawings, etc., prior to submitting for statutory submission of BA14 or equivalent for Certificate of Completion (CoC) purposes
b) Assist Authorized Signatory (AS), stay up to date on the BD website in regard to Practice Notes to Authorized Persons (PNAP), Code of Practice (COP), changes in regulation and provide training to TCPs on latest changes
c) Prepare and liaise with MTR Project team on the submission and implementation of Site Supervision Plan (SSP); provide training to approved TCPs
d) Under the Design Manager, manage and full control on instrumentation and monitoring related issues; including prepare and liaise with MTR Geotechnical / Design / Registered Geotechnical Engineer (RGE) for the Long-Term Monitoring Report of the groundwater, settlement (building and ground) and tilting monitoring
e) Liaise with the Instrumentation Subcontractor onsite and managerial issue while supervising, coordinating, and monitoring the different kind of site monitoring instrumentation works carried
out to observe the effects of ongoing construction works to the existing structure and its surrounding; i.e water level, ground settlement, inclinometer, etc.
f) Review the monitoring data on daily basis and distribute the instrumentation report on daily and weekly basis. Where necessary, prepare and submit reports i.e. Detailed Action Plan (DPA), Developed Action Plan (DAP) for revision of AAA values, to the client and attend weekly / bi-weekly meetings
g) Liaise with MTR, JV Design Management Team and relevant consultants for reviewing monitoring data to ongoing construction work; also used to propose revise AAA values
h) Prepare ITP and method statement according to contractual specification of respective work e.g. instrument installation work; implement and carry out inspection as per agreed with Client
i) Compile and review the related monitoring data prior to carry out relevant construction activity i.e. pumping test, excavation & strut installation (including preloading)
j) Monitor on the subcontractors’ instrumentation installation and monitoring progress prior to validating their monthly progress claim
k) Prepare subcontract draft for tendering purposes i.e. ELS strain gauge & UXO detection, subcontractor site instruction (SCI) and subcontract final account justification for commercial use
l) Review proposed ELS design to suit site condition and carry out Geotechnical inspection as Temporary Work Coordinator (TWC) based on approved Temporary Work Design (TWD) i.e. open cut slope for excavation works
m) Carry out inspection of termination of drillhole and review drill log / report prior to submitting formally to client