Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Work Background
Project Controls Manager
Allan Myers Inc.Project Controls Manager
Jan. 2023Fairfax County, Virginia, United StatesProject Controls Manager/ P6 Scheduler for Allan Myers NOVA Heavy Civil projects. - Roadways - Water Treatment Plants - Data Base Centers - Bridges - DB/DBB Cost Loaded Schedules CURRENT: Neabsco Potomac Parking Garage Wiehle Ave at W&OD Trail DC Water - MFU-8 & Biosolids AWS/23/IAD350 Dulles 28 Technology Park Project VDOT 1-95 & RTE 123 DB COMPLETED: Virginia Inland Port - Capacity Expansion Arlington National Cemetery - McPherson Area Roads
Project Controls Manager
Allan Myers Inc.Project Controls Manager
Mar. 2021 - May. 2023Washington DC-Baltimore AreaProject Controls Manager/ P6 Scheduler for Allan Myers MD at Baltimore/Washington International Thurgood Marshall Airport. COMPLETED: BWI AMF & TW F Ph1 Seg 1 ($44m) BWI ALV Relocation ($23.9m) BWI TW F Ph1 Seg 2 ($9.5m) BWI TW T Ph 1A ($11m) BWI Midfield VSR Project ($1m)
Project Controls Manager
Allan Myers Inc.Project Controls Manager
Jun. 2020 - Feb. 2025Fairfax County, Virginia, United StatesProject Controls Manager for Allan Myers Self Perform work on FAM I66 "Transform 66 Outside the Beltway" Project. 22.5 miles of new Express Lanes alongside three regular lanes on I-66 from I-495 to University Boulevard in Gainesville - $108 Million
Project Engineer
Allan Myers Inc.Project Engineer
May. 2020 - May. 2021Suffolk, Virginia, United StatesProject Controls Engineer/ P6 Scheduler for Allan Myers on Nansemond Treatment Plant Land Acquisition Land Stabilization & Structure Demolition Project for Hampton Roads Sanitation District (HRSD) - $3.7 Million
Project Engineer
Allan Myers Inc.Project Engineer
Feb. 2020 - Jun. 2020Virginia Beach, VAProject Controls Engineer/ P6 Scheduler for Allan Myers on VDOT A61 - Route 58 Laskin Road Widening Project for The City of Virginia Beach & VDOT - $83 Million
Project Engineer
Allan Myers Inc.Project Engineer
Jul. 2019 - Aug. 2020Norfolk, Virginia AreaProject Controls Engineer/ P6 Scheduler for Allan Myers on The Port of Virginia's SNIT Optimization Project Stack Construction at Norfolk International Terminals for Port of Virginia - $172 Million I held a valid TWIC Card issued by the Virginia Port Authority .
Project Engineer
Allan Myers Inc.Project Engineer
Jun. 2017 - Oct. 2019Williamsburg, VirginiaI-64 Capacity Improvements, Segment II - $141 Million • Supervise daily operations and multiple subcontractor crews - Drainage Work Activity - Jack and Bore Operations • Maintain Construction QA/QC • Understand project RFP documents and specifications • Understand project specific Special Provisions • Review and code time sheets • Review and maintain Progress Drawing Plans • Draft RFIs as questions/discrepancies arise • Review & Transfer Submittals as project progresses • Maintain Schedule Requirements
Engineer 3
Cherry Hill Construction, A Tutor Perini Civil East CompanyEngineer 3
Apr. 2014 - Jun. 2017Norfolk, Virginia AreaI-564 Intermodal Connector Design-Build - $90 Million I held a valid RAPIDgate Eid Passport from the DOD. • Supervised daily operations and multiple subcontractor crews • Maintained Design QA/QC • Maintained Construction QA/QC • Understood project RFP documents and specifications • Understood project specific FAR Clauses • Reviewed and coded time sheets • Reviewed Progress Drawing Plans • Reviewed Dig Permits & Miss Utility Requests • Drafted RFIs as questions/discrepancies arose • Reviewed & Transferred Submittals as project progressed • Obtained quotes for buyout • Insured Health and Safety Plan was implemented • Insured Accident Prevention Plan was implemented • Documented Daily Safety Audits/Appraisals
Job Engineer
The Lane Construction CorporationJob Engineer
Jan. 2014 - Apr. 2014Norfolk, Virginia AreaVirginia Sign and Lighting Company • Understood project specifications and verify compliance • Reviewed and coded timesheets • Reviewed, understood and used project cost report • Reviewed, understood and used project CPM via Primavera (P6) • Managed minor subcontracts and inputted quantities in JDE & quantity book • Prepared pay estimate for minor and major subcontractors and contractors • Prepared project submittals as required • Drafted RFIs as questions/discrepancies arise • Participated in the preparation of the project construction schedule & work plans
Associate Engineer
The Lane Construction CorporationAssociate Engineer
Apr. 2013 - Dec. 2013Norfolk, Virginia AreaVirginia Sign and Lighting Company • Reviewed project specifications and verified compliance • Reviewed and coded time sheets • Reviewed and used project cost report • Reviewed and used project CPM via Primavera (P6) • Managed minor subcontracts and input quantities in JDE & quantity book • Prepared pay estimate for minor and major subcontractors and contractors • Prepared project submittals as required • Drafted RFIs as questions/discrepancies arise • Participated in the preparation of the project construction schedule & work plans • Received Packing Slips and Invoices
Associate Engineer
The Lane Construction CorporationAssociate Engineer
May. 2012 - Apr. 2013Chantilly, VirginiaDulles Corridor Metrorail Pedestrian Bridge Project - $4.3 Million • Year long contract • Performed Field Engineer duties for installation of new Pedestrian Bridges for new Silver Metro Line • Reviewed and coded time sheets • Reviewed and used project cost report • Reviewed and used project CPM via Primavera (P6) • Managed minor subcontracts and input quantities in JDE & quantity book • Prepared pay estimate for Contractor • Prepared project submittals as required • Drafted RFIs as questions/discrepancies arise • Participated in the preparation of the project construction schedule & work plans
Office Engineer Intern
The Lane Construction CorporationOffice Engineer Intern
May. 2011 - Aug. 2011Chantilly, VirginiaLane Estimation Department Mid-Atlantic Region • Calculated take-off quantities from bid drawings • Called and received quotes from suppliers • Input quote data and take-off quantities into HCSS Heavy Bid • Attended bid meetings
Field Engineer Intern
The Lane Construction CorporationField Engineer Intern
May. 2010 - Aug. 2010Annandale, VirginiaFluor-Lane I-495 Mega Project - $1.9 Billion • Supervised daily operations • Maintained quality control • Surveyed calculations via GPS Trimble Equipment • Understood project specifications and verify compliance • Reviewed and coded time sheets • Drafted RFIs as questions/discrepancies arise

Requests

Touchpoint image
0
Personal Pitch
Data Entry Services. (remote, after hours, preferably)
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Jessica on Intch
Data Entry
525823 people
17
Assistant manager
16
Customer service specialist
17
Sr Director, Customer Support
Data EntryTyping Specialist
149897 people
17
Sr Director, Customer Support
17
IT Tier 1 Support @ University Hospital of the West Indies
16
Actor