Jun. 2018 - Jul. 2019Taubaté Area, Brazil1. 5S Audits - Leader of the re-establishment of the 5S audits program in the whole site.
2. Turnaround Plan of Bars Line - Leader of the project that reduced in 87,50% the bars height issues after pressing machine; main actions: improve thepressing machine program and its input variables.
3. Minha Melhoria Program - Leader of the program and responsible to organize data, present the event and make this continuous improvement program stronger.
4. Virtual Simulation of Francis Runners Line - Lead the sourcing of information from GE Taubaté to GE Istambul about the Francis Runner's Line.
5. Lean Action Workout - GE Wind Camaçari - Kaizen week and line balancing in the Machine Head's Assembly Line.
6. Practice the Continuous Improvement - Daily use of Lean tools at GE Hydro Taubaté: OBC and Yamazumi, VSM, A3, Spaghetti, 5S, Visual Management, 8 Wastes.
7. 3P Event of Electrical Factory Layout - 7 Ways - Supporting the leaders to elaborate the event.
8. 3P Event - Hub 2.5 - Leader and host of the event that needs the direct involvement of the stakeholders.
9. Onboarding Interns EID - Responsible to show the site for the new interns onboarding.
10. Lean Group Study - Creator of a lean group study with the Taubaté' site interns.
11. Direct participation:
- VSM Bed Plates elaboration - GE Wind;
- Lean Challenge 2018;
- Hoshin Kanri Methodology - with the Management Team in the monthly follow up meetings;
- VSM elaboration and active presence in the lead time reduction - Araraquara Project.