ComEdMeter Reader / Splicer / First Line Supervisor
Jul. 1990 - Jul. 2007Chicago, Illinois, United States Supervised up to 70 Union personnel, directing them to construct, maintain, and work emergent jobs on the 4 and 12Kv electrical underground distribution system and the 34kv sub-transmission system in the city of Chicago. I directed, managed, and coordinated multiple construction job assignments, planned and emergent, performed at one or more locations spanning multiple shift operations.
Suspended a crew for willful violation of Company safety rules. Administrator of Drive-Cam vehicle monitoring program for 3 UG reporting centers
Administrator of ARCOS system for Chicago North UG Dept.
Read meters on a daily basis in various locations, Cities, and Counties in all weather conditions.
Splice all cables (Concentric and PILC) on ComEd's secondary voltage Network, 4KV, 12KV, and 34KV distribution and sub-transmission system and 69KV transmission system. I have worked with cable pulling, manhole, and elevated position equipment.