Keep in touch with meI'm using Intch to connect with new people. Use this link to open chat with me via Intch app
Work Background
IT Senior Manager / Data Center Specialist / IT Campus Architect / Project Manager
Liebherr Mining Equipment, Co.IT Senior Manager / Data Center Specialist / IT Campus Architect / Project Manager
Jan. 2021Newport News, Virginia, United StatesCurrently in the same role under renewed management. During normal department duties in 2019/2020, I've also had the chance to successfully execute a once in a lifetime IT project for Liebherr. Liebherr USA executive management enabled me and my team to plan, budget, design, procure and oversee the build into production of the entire IT infrastructure for a new campus at 4800 Chestnut Ave in Newport News (Cisco network, WiFi, AV, Security, DataCenter, etc.). Selected, purchased and provisioned latest technology in A/V systems and conferencing rooms. Designed, procured and built a new state of the art data center from scratch, using Liebert/Vertiv/Samsung components with self sourced local contractors and resources. Worked with the City of Newport News for permitting and closely with the GC (WM-Jordan) from ground breaking to the certificate of occupancy during the construction of the campus. Coordinated the relocation of the moving Liebherr USA employees to their new campus in terms of IT, which completed the project successfully on time and under budget by 1/2 mil.
IT Senior Manager/Systems Integrator/Software Developer/ ERP Business Analyst/ IT-Security Auditor
Liebherr Mining Equipment, Co.IT Senior Manager/Systems Integrator/Software Developer/ ERP Business Analyst/ IT-Security Auditor
Mar. 2016 - Dec. 2020Newport News, Virginia - USADue to a restructuring merger of several Liebherr divisions into trading and production companies within the US market, IT was designated a shared service provider and was moved into the only production company in the US, under the existing IT manager of Liebherr Mining Co. Roles and responsibilities stayed the same under new leadership.
IT General Manager/Systems Integrator/Software Developer/ ERP Business Analyst/ IT-Security Auditor
Liebherr Mining Equipment, Co.IT General Manager/Systems Integrator/Software Developer/ ERP Business Analyst/ IT-Security Auditor
Jan. 2015 - Mar. 2016Newport News, Virginia - USAManaged IT operations of all Liebherr US divisions in North America (10). Provided Baan IV ERP manufacturing, distribution and finance support: Year end closings, audits, IRS audit and litigation support. Managed windows domain for approx ~1000 end users. Supervised lawsuit data recoveries . Implemented disaster recovery policies and procedures to ensure business continuation. Managed and executed all hard and software purchases...
IT Senior Admin/Systems Integrator/Software Developer/ ERP Business Analyst/ IT-Security Auditor
Liebherr Mining Equipment, Co.IT Senior Admin/Systems Integrator/Software Developer/ ERP Business Analyst/ IT-Security Auditor
Nov. 1998 - Dec. 2014Newport News, Virginia - USAExecuted ERP data migration of all Liebherr US and Canadian divisions from various legacy systems to Baan IV ERP system (comparable to SAP). Designed from scratch, installed, managed and maintained MS-Exchange email and Proxy/Firewall environment for North American divisions (~800 Users). Selected and hired additional personnel to build up working IT departments in several divisions. Managed and executed all hard and software purchases. Designed and built state of the art data center infrastructure to comply with tight corporate IT security policies (backup generator & ups power management / fire suppression / emergency lighting / etc.).
IT Administrator /Systems Integrator / Software Developer
Liebherr Mining Equipment, Co.IT Administrator /Systems Integrator / Software Developer
Nov. 1997 - Oct. 1998Liebherr Gear Technologies - Saline, MISelected, purchased and installed server and networking hardware to build up the entire IT environment and LAN/WAN network for Liebherr's presence in the USA, provisioned and installed first Internet communication services with local telco, launched first MS-Exchange based e-mail service and provisioned initial firewalled Internet access. Selected and trained key users for upcoming ERP migration. Executed data migration from legacy system for several different companies to Baan IV.
Project Manager, Duratec Engine Assembly Plant
Liebherr Mining Equipment, Co.Project Manager, Duratec Engine Assembly Plant
Jan. 1994 - Nov. 1997Liebherr Automation Systems for Ford Motor Company - Cleveland, OhAmong the duties and tasks shown below that carried over, managed installation and programmed several two ton railed autonomous vehicles to transport containerized stacks of cam shafts from one machining center to the next (helped lay down the heavy rails by hand). Helped to pitch and sell and then later managed the design stage of the first telescopic, six headed gantry line that Liebherr ever built - to move Jaguar engine heads from machine to machine operation.
Robotic Overhead Gantry Installation Supervisor
Liebherr Mining Equipment, Co.Robotic Overhead Gantry Installation Supervisor
Apr. 1992 - Jan. 1994Liebherr Automation Systems for Ford Motor Company - Cleveland, OhInstalled 120 gantry robots covering the movement of in process work-pieces: Camshafts, Crankshafts, Cylinder Blocks and Cylinder Heads. Executed the assembly of the various parts and beams, delivered from the plant in Europe, the mechanical installation, alignments and initial try-out at the customer site. Rewrote from scratch most of the factory designed CNC and PLC programs, once the customer decided that they didn't meet customer requirements. Lead all mechanical and electrical aspects of the installation, including communications and dealing with the local auto workers union (UAW) over the course of several years.
Commercial Food Production Maintenance Electrician
Kaeserei Champignon, Heising - GermanyCommercial Food Production Maintenance Electrician
Feb. 1992 - Mar. 1992Kaeserei Champignon, Heising - GermanySummer job to bridge vacation gap to return to Liebherr after military service: Gained extensive knowledge about commercial food processing, hygiene laws and regulations to operate a business in this field.
Military Service
German Army, Mountain Infantry Communications Division 1/8 Kemmel - MurnauMilitary Service
Apr. 1991 - Feb. 1992Deutsche Bundeswehr3 months of standard combat training, vehicle and weapons handling, care and use training. Joined the administrative division and was promoted to replace the departing corps wide logistics administrator. Processed all requisitions for spare parts, munitions, fuel, and consumables as well as food supplies for the division.
Industrial Robotics Installation Technician
Caterpillar Engine Plant, Charleroi - Belgium for LiebherrIndustrial Robotics Installation Technician
Mar. 1990 - Feb. 1991BelgiumInstalled, programmed and CNC taught eight multi million dollar overhead gantry robots to transport and help manufacture large ten cylinder engine blocks for hydraulic excavators.
Industrial Gantry Robot CommisioningTechnician
Liebherr Verzahntechnik GmbH, Kempten - GermanyIndustrial Gantry Robot CommisioningTechnician
Sep. 1989 - Mar. 1990Liebherr Verzahntechnik GmbH, Kempten - GermanyvResponsible for planning, setup, power-up and troubleshooting of large automotive gantry robots on the factory floor, sometimes longer than 2500 ft. Often tasked to meet with international customer engineering teams to for final sign off on the product. First exposures to many different cultures from various countries.
TV and Audio Service Technician
Fernsehtechnik Gruber, Kempten - GermanyTV and Audio Service Technician
Aug. 1988 - May. 1989Fernsehtechnik Gruber, Kempten - GermanySide Job: On customer premises troubleshooting, delivery and programming of TV's and Audio equipment. Later in shop troubleshooting and repair of TV's and Audio equipment.
Apprenticeship to Industrial Mechanic, Electrician, Electronics, Programmer
Liebherr Verzahntechnik GmbH, Kempten - GermanyApprenticeship to Industrial Mechanic, Electrician, Electronics, Programmer
Sep. 1986 - Sep. 1989Liebherr Verzahntechnik GmbH, Kempten - Germany- Mechanical apprenticeship in metalworking with ferrous metals , brass, copper, aluminum and plastics. After 6 months mechanical and passing that, transition to the Electrical group after passing that, later on to the Electronics group at Liebherr. Completed projects that included operation of large and small milling machines, surface grinders, hones, welders, turning pieces on lathes, operating gear cutting CNC machines, operating 6-axis arm style welding robots and simple, but extremely large three axis gantry robots. - Commercial Trade Degree in Electronics and Programming, specialized in Industrial Robotics. Graduated early, with best in state honors by IHK Schwaebia.
Intch is a Professional Networking App for the Future of Work
300k+ people
130+ countries
AI matching
See more people like Mac on Intch
IT
451129 people
18
Technologist, Project/Program Manager
24
Data Scientist Intern @ Newell Brands
16
Program Manager @ DISH Network
ITProject Manager
126222 people
18
Technologist, Project/Program Manager
15
Data Analyst
24
Looking to transition into Tech./. Former sales Representative and have very good Communication skilss @ @NikeStore