INA GrupaSenior Gas Production engineer
May. 2019Zagreb, CroatiaDeployment of well, reservoir, facility management on (Operation Excellence) HTHP gas fields that include:
- Collecting and QC of IPM input data (pVTP-MBAL-PROSPER-GAP-RESOLVE-EXCEL VBA)
- Defining Integrated System Capacity with associated limit diagrams (maximum production potential with surface network, water injection and gas treatment plant constraints)
- Planning and follow up aggressive well interventions for brown field development strategy artificial lift re-completion from SRP to ESP, rigless operations including perforation, slide sleeve manipulation for water shut-in, artificial lift optimization,
- Production forecasting (dynamic modelling, decline curve analysis),
- Production surveillance (virtual flow metering/production back allocation) for gas producing and water injection wells with associated daily/weekly/monthly production reporting and chasing optimisation opportunities
- Production technology studies (RT WC metering, data base integration, IPM model management, DOF architecture)
- Attending international petroleum engineering events and holding presentation on University on Petroleum Engineering Faculty, Croatian Petroleum Engineering Association